December 1, 2005
Jacqueline Hernandez
Caldwell Community Development Department
TRANSPORTATION BOARD 621 E. Cleveland Blvd
Charles Winder Caldwell, ID 83605
Chairman Email: mhalstead@ci.caldwell.id.us
6 ?005 fj ;
John X. Combo
1/rceChairmarr Re: ANNEX / PRE PLAT o
District 6 Location: US 20/26 & Midland Blvd.
John McHugh Route: US 20/26
District 1 Name: White Pine Station Sub (Landmark Engineering, Applicant)
Bruce st:eenoy Case: ANN-107-05 & SUB-131 P-05
District 2
Dear Ms. Hernandez:
Monte McClure
District 3
The Idaho Transportation Department (ITD) appreciates the opportunity to comment on the
Gary Blick above referenced application. Per the city's December 13 notice (dated November 2,
District a 2005) regarding the applicant's request for the annexation of 195.47 (69.5 as Single Family
Neil M.1ler Residential; 30.47 as Community Commercial and 95.5 acres as Single Family Residential)
District 5 and preliminary plat approval for the property located on Highway 20/26 and Midland Blvd.
ITD asks the City of Caldwell to consider the following as conditions of approval:
David Ekern, P.E.
Director General Comments:
o ITD and COMPASS have begun a corridor preservation project on US-20/26 to be
Sue Higgins prepared for future widening needs on this corridor.
Boar�Secrerary o This property is located adjacent to US-20126. This segment of US-20/26 is a
regionally significant Principal Arterial.
o Access management on this highway is implemented through the ITD Access Control
Policy. This segment of US-20/26 is designated as Type IV.
o Access to the state highway will be allowed only at the half -mile point between Midland
Avenue and Middleton Rd. ITD recommends that a north -south Collector route be
planned at this location.
o The applicant has requested annexation and a significant change in the type and
intensity of use for the referenced property.
We ask City of Caldwell to consider the following as conditions of approval of the
annexation:
o No direct access allowed to US 20/26.
o Prior to preliminary plat design, the developer should propose a circulation system that
accommodates future traffic in and through the applicant's property. This system
should be reviewed and approved by the City and ITD before detailed site design is
done. The system should show a frontage or backage road that serves as a parallel
collector road to US 20/26. The system should provide connectivity to all adjacent
parcels.
1ph . 'j
r�'
Connectivity.
o The site design for White Pine Station Subdivision should be revised to show a stub or curb cuts to
access the following parcels to provide for future connectivity.
• From Skyway Rd. to the two parcels in the triangle piece of land located adjacent to the
southern portion of the development (on the East side of the railroad tracks); and
• From Bear Patch Ct. to the triangle parcel located between US-20/26 and the northern portion
of the development (on the West side of the railroad tracks).
Setbacks. The future highway widening for a four lane divided highway will require a 200' right of way. We
will need to shift the highway to the south in this area to avoid the high voltage power line. ITD requests the
City condition the annexation on a setback of 200 feet, measured from the northerly existing right of way line
to accommodate the future widening.
Noise Abatement for Residential Development. Should the development include residential buildings,
along the state highway, please require the following:
1. The applicant shall provide traffic noise abatement by constructing a berm or a berm and wall
combination approximately parallel to the state highway and off the state right of way.
2. The top of the berm, or berm and wall in combination, shall be a minimum of ten feet higher
than the elevation at the centerline of the state highway.
3. If a wall is proposed, the wall shall meet the following standards:
a. Wall materials shall be impervious concrete or stucco, unless otherwise approved by
the Idaho Transportation Department as a sound attenuating material.
b. Intermittent breaks in the berm or berm and wall in combination will degrade the
function and should not be allowed.
4. Alternative noise abatement designs that meet Federal Highway Administration guidelines
may be proposed by the developer. The applicant should contact Greg Vitley, Environmental
Section Manager.
Traffic Impact Study. The applicant should complete a Traffic Impact Study (TIS) to determine development
impacts to the State Highway. ITD may require improvements to the State Highway to mitigate for these
impacts. Typical improvements may include: acceleration and deceleration lanes, center turn bays and/or
intersection signalization. The TIS should be submitted to Kevin Sablan at the ITD letterhead address.
Work on the State Highway. A permit will be required for any work on the highway. See contact below.
Contacts
Sue Sullivan
Kevin Sablan
Greg Vitley
Matt Ward
Sincerely,
� &IIrC/r;t-
Sue Sullivan
Sr. Transportation Planner
ss:ah
Senior Planner
Traffic Engineer
Environmental Section Manager
Permits Coordinator
334-8955
334-8340
334-8952
334-8341
November 22, 2005
Community Development Dept
City of Caldwell
P.O. Box 1177
Caldwell, ID 83605
CAI'7N HIGHWAY DISTRICT NO.4
15435 HIGHWAY 44
CALDWELL, IDAHO 83607
CanyonH4i�AOL.COM
TELEPHONE 2081454-8135
FAX 2081' 454-2008
!rf, NOV 28
2005
RE: White Pine Station Subdivision Case No. ANN-107-05 & SUB-131P-05
Canyon Highway District No. 4 has reviewed the above referenced subdivision and annexation request
and provides the following comments:
l . Traffic Impacts. The District is concerned about the impacts of the proposed development on
the surrounding road network. In particular, the District is concerned about the impacts on the
roadways and intersections of Hwy 20/26, Midland Road, and Linden. A traffic impact study
should be required for the project to assess the impacts of development on the surround roads and
streets and recommend mitigation measures. The development agreement should include a
provision that the developer contribute a proportionate share, based on the volume of traffic
contributed by the development, of the cost of any traffic mitigation (i.e. traffic signals and
intersection improvements) at locations impact by this development that will be completed later.
2. Midland Road Frontage Improvements. A 40' right-of-way dedication along Midland Road is
required. The frontage shall be improved to meeting the City of Caldwell's arterial street
standard, except that surfacing depths shall meet the Highway District Standards.
Thank you for the opportunity to comment on this request. Please call me or Casey Bequeath, Director at
454-8135 if you have questions.
Sincerely,
GG�
Timothy Ri ard, P.E.
Engineer
Cc: Casey Bequeath, Director CHD4
?A - 2
1) 17/2-05 17:39 FAX 2084594491 PIONEER IRRIGATION CALDWELL P Z 2 001!004
Pioneer Irrigation District
JEFF SCOTT
Superintendent
MARK ZIRSCHKY
Asst. Superintendent
November- 7, 2005
City of Caldwell Community Development Department
Fax. 455-3050
Attn: Jacqueline Hernandez
P O. BOX 426 a CALDWELL, IDAHO 83606
:208) 469-3617
NAIDA KELLEHER
Secretary -Treasurer
I
r--
�� ++ NOV
Re: Case Nos. ANN-107-051SUB-131P-05, (White Pine Station Subdivision)
TO WHOM IT MAY CONCERN:
Note: Pioneer Irrigation District will not own and operate any commercial development.
Please be advised there are delivery points in place for the property being proposed for development.
Pioneer Irrigation District's main concern is that all water rights within the District be honored, and that
access to irrigation water be provided to every parcel of land_ Delivery points for said property are
gates 18,19 and the Korbisky Dump — Highline Canal.
All existing easements, right-of-ways, and other means used to honor the water rights to
downstream waterusers must be maintained and allowed to continue to exist. It is imperative that no
one disrupt the delivery of water to a downstream water user.
Any lateral, canal, drain or other means used to deliver water, along which there is a right-of-way or
easement, must have the same kept clear of all obstructions at all times. No fences, structures, or
other materials are allowed on any of the District's easements or right-of-ways AND they must be
recorded on the final plat. The 100(Weymouth Lateral), 200(7.2 Lateral) have a 16 foot
prescriptive use easement from top of bank, both sides. The Highline Canal has also has a 16
foot prescriptive use Easement from top of bank, both sides.
Any discharge or run-off into a federal drain must meet the approval of Mr. John Caywaod of the
Bureau of Reclamation. Pioneer irrigation District does not assume any responsibility for such an
approval. His telephone number is 334-1463. Attention: Mason Creek Drain 010 foot easement
—55 ft from center) The Maddens Spur Drain is a Pioneer Irrigation District drain (not BOR),
which also has a 110 foot right of way, 55 feet from center on each side.
1.)'.07,,2005 17:39 FA.i 2084594491 PIONEER IRRIGATION dCALDWELL P Z 0 002/004
Please be advised that in order to satisfy the City of Caldwell and Canyon County requirements and
IF it is the intent of the developer to put in a pressurized irrigation system and have Pioneer take over
said system once the development is completed, the following steps are necessary:
9. Said system must be put in according to the current Standards and Specifications of
Pioneer Irrigation District.
2. A Construction, Operation and Maintenance Agreement must be written up and recorded
at the expense of the Developer and/or owner. All agreements must be reviewed by and
approved by the District's Attorney, Scott Campbell, of Moffatt Thomas in Boise. The
least expensive way to have an agreement drawn up which meets the needs of the District
is by having Mr. Campbell himself draw it up. Otherwise there will be two attorney fees for
said developer and/or owner to pay. Mr. Campbell may be a)ntacted at 345-2000. A
deposit of $1000.00 must be paid to Moffatt Thomas to cover th,: attorney fees before the
work can begin. Any unexpended portion of the deposit will be refunded. Pioneer
Irrigation District will recommend disapproval of final plat approval until the necessary
agreement has been executed and recorded.
3. The engineering fees will be the responsibility of the developer and/or owner, and a
deposit must be paid in advance to Pioneer Irrigation District before the District will
authorize Earl Mason & Stanfield to review engineering plans. Plans must be received
by Pioneer Irrigation District by December 15th 2005. All construction which may
impact district facilities must be completed prior to the March 15th 2006 deadline.
The construction time -frame which Pioneer allows is November Vt of the current
year to March 15th of the following year. Estimated costs for the District's engineering
fees are $500 plus $5.00 per lot. If that amount fails to cover the costs involved due to the
necessity to revise plat maps, etc., additional costs will
be billed out and paid prior to the District's signing off on the final plat.
4. If it is the developers plan to have Pioneer Irrigation District take over a pressurized
irrigation system for the subdivision, it will be necessary that the pump site be designed at
the District's current point of delivery. Service to the subdivision from the pump site must
have its own private delivery line from the delivery point to the subdivision.
5. The developer must contact the office of Earl Mason & Stanfield to make arrangements
for on -site inspections to be made at various points of construction. An engineer from
Earl Mason & Stanfield must be involved in the inspections as they are the engineers for
Pioneer Irrigation District and are familiar with the requirements of Pioneer.
6. Earl Mason and Stanfield must walk through the site and develop a punch list to be
completed prior to recommending that Pioneer Irrigation District take over the pressurized
irrigation system.
1;r07/2005 17:39 FAX 208459449 PIONEER IRRIGATION CALDWELL P Z IM003/004
If it is NOT the intent of the developer to request Pioneer Irrigation District to take over a pressurized
irrigation system within their completed development, then the above six steps do not apply to their
Planned development.
Any proposed development which will have downstream waterusers using gravity flow irrigation must
develop their irrigation system in a manner which will insure the downstream waterusers the ability to
acquire at least as much irrigation water for gravity flow irrigation as what they received prior to any
development or construction taking place, The gravity flow irrigation system must be totally separate
from the proposed pressurized irrigation system within a subdivision.
Please be advised, the developer shall submit detailed drawings Of anY proposed relocations of
Pioneer Irrigation District's facilities, prior to preliminary plat approval. Any said relocations are
subject to approval from the Superintendent and/or the Board of Directors of Pioneer Irrigation District
Any construction that impacts Waters of the United States may require obtaining a 404 permit from
the Corp of Engineers. Greg Martinez of the Corp of Engineers can be contacted at 345-2154.
Prior to finalization of any Agreements with Pioneer Irrigation District, Pioneer irrigation District must
receive a copy of a 404 permit that has been properly executed. If it is determined by the Corp of
Engineers that a 404 permit is not required, Pioneer Irrigation District must be notified in writing by the
Corp of Engineers that said 404 permit is not required.
NOTE: This letter does not authorize any construction to commence until all the necessary
agreements with Pioneer Irrigation District have been executed and recorded.
If you have any questions, please feel free to call.
Sincerely,
Mark F. Zirschk
Assistant Superintendent