January 14,2011
City of Caldwell Community Development Department
Attn: Anne Marie Skinner
Email: amskinner@ci.caldwell.id.us
Re: Case No. SUB/PUD-205P-10 (Whitney Springs Subdivision) Preliminary Plat
TO WHOM IT MAY CONCERN
Please be advised there is a delivery point in place for the property being proposed for development. Pioneer
lrrigation District's main concern is that all water rights within the District be honored, and that access to irrigation
water be provided to every parcel of land. Delivery point for said property is headgate 30 - 13.3 Center Lateral.
All existing easements, right-of-ways, and other means used to honor the water rights to downstream waterusers
must be maintained and allowed to continue to exist. lt is imperative that no one disrupt the delivery of water to a
downstream water user.
Any lateral, canal, drain or other means used to deliver water, along which there is a right-of-way or easement,
must have the same kept clear of all obstructions at all times. No fences, structures, or other materials are allowed
on any of the District's easements or right-of-ways AND they must be recorded on the final plat. The Villanue
Lateral has a 16 foot from top of bank easement along both sides of the lateral. The 13.3 C'enter Lateral also has a
16 foot easement from top of bank along both sides of the lateral.
Storm water discharge will not be accepted into Pioneer lrrigtion District's facilities.
There are to be no pathwavs within Pioneer lrrioation District easements.
Any discharge or run-off into a federal drain must meet the approval of Lupe Rodriguez of the Bureau of
Reclamation. Pioneer lrrigation District does not assume any responsibility for such an approval. Her telephone
number is383-2221. The Solomon Drain has a 110 foot right of way, 55 feetfrom the centerline of the drain on
each side.
Please be advised that NO change to or crossing of a District facility can take place unless a License Agreement or
Crossing Agreement between the District and the owner/developer of the property has been signed and recorded.
Please contact the District's Attorney, Scott L. Campbell, in writing if you need to obtain such an agreement. His
contact information is: Scott L. Campbell, Moffatt Thomas garrett notk & Fields, Chtd., 'l01 S. Cafitol Blvd., 10h
Floor, Boise, ldaho 83702, phone: (208) 345-2000, fax: (208) 385-5384.
A License Agreement or Crossing Agreement must be written up and recorded at the expense of the Developer
and/or owner. All agreements must be reviewed by and approved by Mr. Campbell. The least expensive way to
have an agreement drawn up which meets the need of the District is by having Mr. Campbell himself draw it up.
Otherwise there will be two attorney fees for said developer and/or owner to pay. A deposit of $1000.00 must be
paid to Moffatt, Thomas to cover the attorney fees before the work can begin. Any unexpended portion of the
deposit will be refunded. Pioneer lrrigation District will recommend disapproval of the final plat approval, until the
Ph{
agreement has been executed and prded. lf construction begins withoutf required agreement, Pioneer
lrr-igation District will pursue judicial ,"iil[o stop the construction. \
Noite: The construction time frame to accept plans for construction has been missed.
'ptans must be received by pioneer Irrigation District by Decembql {stn, 2011. All construction which may
impact District facitities must be compieted prior to the March 15th,2012 deadline. The construction time-
frame which pioneer trrigation District allows ls ttovemUei f" of tn" current year to March 15th of the
following year.
Ten percent (10%) of the plD project costs, as determined by Pioneer lrrigation District's engineer, shall be
deposited with pioneer, in the iorm of a cashier's check, payable to Pioneer lrrigation District, at the time of
execution of the agreement by the Developer/Land Owner. Pioneer shall refund this deposit if the construction is
completed by March 1Sth, and in accordance with the terms of the agreement, otherwise the deposit shall be
forfeited to Pioneer lrrigation District.
lf construction is not completed by March 1sth in a manner which allows for adequate delivery of water, Pioneer will
intervene and perform whatever work is necessary to allow adequate delivery of water to patrons_. This work will be
performed at the convenience and discretion of Pioneer lrrigation District. The Developer/Land Owner shall pay the
costs of this remedial work.
Any proposed development which will have downstream waterusers using gravi$ flow irrigation must develop their
irriiaiion system in a manner which will insure the downstream waterusers the ability to acquire at least as much
irrilation w'ater for gravity flow irrigation as what they received prior to any development or construction taking place.
Th6 gravity flow irri-gation system must be totally separate from the proposed pressurized irrigation system within a
subdivision.
please be advised, the developer shall submit detailed drawings of any proposed relocations of Pioneer lrrigation
District,s facilities, prior to preliminary plat approvat. Any said relocations are subject to approval from the
Superintendent and/or the Board of Directors of Pioneer lrrigation District
Any construction that impacts Waters of the United States may require obtaining_a 404 permit from the Corp of
Engineers. Greg Martinez of the Corp of Engineers can be contacted a|345-2154-
prior to finalization of any Agreements with Pioneer lrrigation District, Pioneer lrrigation District must receive a copy
of a 404 permit that has
-bee-n
properly executed. lf it iJdetermined by the Corp of Engineers that a 404 permit is
not requiied, pioneer lrrigation oiitriit must be notified in writing by the Corp of Engineers that said 404 permit is
not required.
NOTE: This tetter does not authorize any construction to commence until all the necessary agreements
with Pioneer trrigation District have been executed and recorded.
lf you have any questions or comments, please do not hesitate to call.
Sincerely,
r,/fr
Mark F. Zirschky
Superintendent
oo
Memorandum
To:
From:
Re:
Date:
Anne Marie Skinner, Senior Planner
Robb MacDonald, Assistant City Engineer
Tim King, Engineering Tech ll
SUB/PUD -205P-10 Whitney Springs Sub
August 31, 2010
KN
The Engineering Department provides the following comments on a request by Washington Trust
Bank, Trilogy Development and Stanley Consultants for preliminary plaUplanned unit development
approval of Whitney Springs Subdivision consisting of 32.2 acres and 140 buildable lots to be
developed in four phases, located in an R-1 Low Density Residentialzone approximately 1850 feet
east of Middleton Road and approximately 1300 feet south of Ustick Rd.This request represents a
new preliminary plat for the undeveloped and unplatted portion of the existing Whitney Springs
Subdivision.
Development Plans
1. Development Plans - Priorto commencing construction, plans must be prepared by the
developefs engineer and approved by the City Engineering Department which shall include the
following items:
a. Street section and alignment (including curb and gutter);
b. Sidewalk (5 foot on Laster Street and Santa Anna Ave. 4 foot on others);
c. Sanitary sewer (per City and DEQ requirements);
d. Potable water (per City and DEQ requirements);
e. Stormwaterfacilities (per City requirements/manual);
f. Street lighting (per City standards);
g. Street signage (per City and MUTCD requirements);
h. Vertical Datum based on NAVD 88 Datum.
General
L Easements for Utilities shall be 10 feet wide along allfront and rear lot lines. A 10 feet wide
easement along select interior lot lines shall be provided to facilitate pressure irrigation.
\H-L\Page 1 of6
oo
2. Appropriate easements for transmission lines and other utilities shall be clearly indicated, with
recorded instrument numbers provided for said easements, on the face of the plat (visually and
in writing).
3. All street, sewer, water, fire protection, and street light facilities must be dedicated to the City.
Some conveyance facilities for stormwater drainage may be eligible for dedication to the City
4. Construction of facilities to be dedicated and/or within public right-of-way shall be performed by
an appropriately licensed public works contractor and constructed to City of Caldwell
specifications.
5. Prior to commencement of construction in any dedicated right-of-way, or construction of any
improvement intended for dedication to the City or connected to a City facility, the City
Engineering staff is to be notified. This preferably willtake place in a pre-construction
conference scheduled by the engineer of record in which all appropriate personnel and utilities
are present. Appropriate City personnel are to be notified in advance of all testing (including
compaction, pressure and coliform, etc.) and given opportunity to be present during conduct of
the testing. The engineer of record or his designated representative is to witness alltests and a
log of inspection visits and testing results is to be kept by the engineer of record or his
representative.
6. The developer is to employ a responsible design professional, preferably the engineer of
record, to oversee and inspect construction, to perform and/or observe all requisite testing of
completed facilities, and to certify that improvements have been constructed according to
approved plans and in compliance with applicable City, State, and Federal standards.
7. The engineer of record shall be held responsible to ensure that subdivision improvements are
in substantial compliance with said engineer's design. Following the construction of the
subdivision improvements, the developers engineer shall provide the City of Caldwell
Engineering Department with electronic and reproducible Mylar As-built plans suitable for blue-
line reproduction for future reference and to establish that the engineer of record has caused
construction to occur in substantial compliance with the design of said engineer of record.
8. Any note, item or drawing element on the plats, construction drawings, engineering drawings
and/or deslgn drawings related to the property inconsistent with City Codes, Policies and/or
Ordinances shall not be construed as approved unless specifically addressed and granted by
City Council.
Riqhts-of-Wav
1. Santa Anna Ave is classified as a Collector. The applicant shall be required to dedicate as
public right-of-way a thirty{hree (33) foot one half width right-of-way along the Santa Anna Ave
frontage to meet City of Caldwell requirements.
2. Laster Lane. is classified as a Collector. The applicant shall be required to dedicate as public
right-of-way a thirtythree (33) foot one half width right-of-way along the Laster Lane frontage to
meet City of Caldwell requirements.
3, A twenty-four (24) foot full width right-of-way shall be required for public alleys.
Page 2 of 6
oo
4. The applicant shalldedicate as public right-of-way a minimum fifty-six (56) fullwidth right-of-
way along all other proposed public streets.
5. A note shall be placed on the Final Plat indicating that all rights-of-way are to be dedicated to
the public.
Street
1. The applicant shall improve Santa Anna Ave. to include a 22.5 foot half- width street section
center-line to back of curb with an additional 5.5 foot wide paved street section to provide for a
two directional flow of traffic. The street shall feature standard vertical curb and gutter, 5 foot
sidewalks, sub-base and asphalt paving, required storm water drainage facilities and
streetlights. These improvements are to extend the entire length of the subject property.
2. The applicant shall improve Laster Street. to include a22.5 foot half- width street section
center-line to back of curb with an additional 5.5 foot wide paved street section to provide for a
two directional flow of traffic. The street shall feature standard vertical curb and gutter, 5 foot
sidewalks, subbase and asphalt paving, required storm water drainage facilities and
streetlights. These improvements are to extend the entire length of the subject property.
3. The applicant shall improve all other public streets to include a minimum 37.0 fullwidth street
section back of curb to back of curb. The streets shall feature standard rolled curb or 6" vertical
curb and gutter, 4 foot sidewalks, sub-base and asphalt paving, required storm water drainage
facilities and streetlights.
4. Alleys shall be improved to include a24.O foot full width section back of curb to back of curb
and shallfeature standard rolled curb. Sidewalk is not required.
5. Any approaches on Santa Anne Ave and Laster Street shall meet requirements as specified in
the CaldwellAccess Control Standards for State Administered Highways And City
Administered Surface Streets Ordinance.
6. Lots adjacent to public alleys shalltake access from said alley. Street access shall not be
permitted.
7. All utility lines on and within the boundaries of the proposed subdivision shall be underground
8. ln accordance with City requirements, a note shall be placed on the final plat stating that no
individual lot will be allowed to take direct access to Laster Street or Santa Anne Ave.
Water
1. All on site water mains will need to be looped into existing mains for fire flow and water quality
purposes. lntemal main sizing and construction plan approval, will be dependent upon the
availability of fire flow.
2. Each buildable lot shall be supplied with potable water. The location of water service, including
sizing of mains, providing of easements, frontage construction, and offsite construction are to
Page 3 of 6
t
oO
be decided during review of improvement plans. This development will be required to comply
with the Water Master Study.
3. The applicant shall extend 12" main lines along the entire Santa Anna Ave. and Laster Street
frontages.
Sanitarv Sewer
1. lt shall be the responsibility of the applicant's engineer to verify that connection to existing
sewer mainlines will not exceed the functional capacity of said mainlines. Provision for
connectivity by future developments shall be met in accordance with cunent City standards.
2. The nearest sewer is an 8" line located at the intersection of Mesa Springs Street and Blue
Springs Street in the Whitney Springs No.2 Subdivision. The location of sewer seryice,
including sizing of mains, providing of easements, frontage construction, and offsite
construction are to be decided during review of improvement plans. This development will be
required to comply with the Franklin Sewer Study as updated.
3. The applicant will be required (where applicable) to extend all sewer and water mainlines to the
center of adjacent roadways for connectivity by future developments. Locations of said
extensions will be decided during the review of the improvement plans.
4. Each buildable lot shall be provided with individual sewer service
5. Any easements for sewer lines not in the righhof-way should be at a width sufficient to
construct same and not less than 20 feet in width. Easements for adjacent sewer and water
lines not in the right-of-way shall be at a width sufficient to construc't the same and shall be no
less than 30 feet in width.
6. All weather surfaces may be required adjacent to mainlines that fall outside the public right-of-
way. All weather surfaces shall be constructed sufficiently to support heavy equipment
necessary to construct and maintain sewer under all seasonalweather conditions.
lrriqation
1. The Preliminary Plat shows the Solomon Drain running along the westerly boundary of the
proposed subdivision. Existing easements and/or right-of-ways for the drain and any other
irrigation facility shall be determined and clearly indicated on the construction plans and on the
final plat (excluding prescriptive easements). Construction across or re-routing of these facilities
is subject to approval by the Bureau of Reclamation and at their discretion, their assigns.
2. The developer shall maintain any existing upstream drainage rights and downstream inigation
rights across the property. During the design phase of this project, the developer or his
engineer is to contact the appropriate inigation district to help ascertain these rights.
Appropriate facilities shall be provided by the developer to convey irrigation and drainage water
across the property to take care of these offsite needs. There is to be no discharge of gravity
inigation retum water into the subdivision storm water system.
t
Page 4 of 6
oo
2. The development is to include a non-potable water pressure inigation system. The design of
this pressure inigation system is to be reviewed and approved by the Caldwell Municipal
lrrigation District prior to construction plan approval. lt shall be required that the system will be
operated and maintained by the Caldwell Municipal lnigation District.
3. Pump stations shall be located in a platted common lot with a recorded perpetual easement
sufficient for convenient access and maintenance of said pump station. The lot shal! be owned
and maintained by the home owners association.
4. Each lot shall be provided with an inigation service.
5. All pressure inigation mainlines shall be located on private property excepting at street
crossings, and within a public utility easement of a minimum of 10 feet in width centered over
said mainlines.
6. The applicant shall ensure that an adequate continuous irrigation supply flow is available to
meet the pressure irrigation system requirements.
7. Supplying irrigation district shall approve the location of the delivery point
8. The applicant shalltransfer a proportionate share of any existing water right(s), except those
held in trust by an inigation district, to the City of Caldwell for both inigation and domestic water
supply for the subject development. lf this should occur, The City shall assist in registering the
transfer.
9. lrrigation facilities shall be located outside the public-right-of-way and shall be moved, adjusted
and/or improved as ne@ssary to facilitate required street improvements.
Storm Drain
1. As noted previously, provision is to be made for the disposal of stormwater drainage in
accordance with the City Stormwater Management Manualand any updates adopted
subsequent to this application. lt is to be noted that retention designs will be denied in most
instances. A copy of this policy is available upon request. The engineer of record is to provide
calculations, which indicate that the assumptions in his stormwater drainage plan comply with
the requirements of the stormwater manual
2. The applicant shall identify and retain all historicaldrainage discharge points from the property
for the purpose of draining on site storm water detention facilities.
3. The final plat drawing should indicate that storm water detention basins are to be placed in
common lots in accordance with the referenced Stormwater policy. A note should be placed on
the final plat indicating that all areas designated as common areas are to be operated and
maintained by the business owners association.
)
Plat
Page 5 of 6
to
1. Prior to approval of the final plat, subdivision facilities must be completed or an appropriate
construclion security provided. There may be temporary restrictions to the obtaining of building
permits, even with acceptable construction security, depending on fire protection, emergency
service requirements, and City approval of the sanitary sewer system. A 50% temporary
restriction to obtaining of building permits will be enforced until all facility construction has been
completed, inspected and certified by the developers engineer including all punch list items.
2- Upon recordation of the plat, the Engineering Department is to be provided with a reproducible
Mylar copy of said document, suitable for blue line reproduction.
3. An electronic (dwg.) copy of the Final Plat suitable for mapping and addressing purposes will
be required with Final Plat submittal.
Page 6 of 6
t
a o
Anne Marie. Skinner
From:
Sent:
To:
Cc:
Subject:
Mark Zirschky [mark@pioneerirrigation.com]
Monday, August 23,2010 2:15 PM
Anne Marie. Skinner
'Tiffiny Hudak'
Whitney Springs Sub - prelim plat 8-23-10
August 23,2O1O
City of Caldwell Community Development Department
Attn: Anne Marie Skinner
Email: amskinner@ci.caldwell.id.us
Re: Case No. SUB/PUD-205P-10 (Whitney Springs Subdivision) Preliminary Plat
TO WHOM IT MAY CONCERN:
Please be advised there is a delivery point in place for the property being proposed for development. Pioneer
lrrigation District's main concern is that all water rights within the District be honored, and that access to irrigation
water be provided to every parcel of land. Delivery point for said property is gate 30 - 13.3 Center Lateral.
All existing easements, right-of-ways, and other means used to honor the water rights to downstream waterusers
must be maintained and allowed to continue to exist. lt is imperative that no one disrupt the delivery of water to a
downstream water user.
Any lateral, canal, drain or other means used to deliver water, along which there is a right-of-way or easement,
must have the same kept clear of all obstructions at all times. No fences, structures, or other materials are allowed
on any of the District's easements or right-of-ways AND they must be recorded on the final plat. Storm water
discharge will not be accepted into Pioneer lrrigtion District's facilities. The 13.3 Center Latera! has a 16 foot from
top of bank easement along both sides of the lateral.
There are to be no pathwavs within Pioneer lrriqation District easements.
Any discharge or run-off into a federal drain must meet the approval of Lupe Rodriguez of the Bureau of
Reclamation. Pioneer lrrigation District does not assume any responsibility for such an approval. Her telephone
number is 383-2221. Solomon Drain - 110 foot Federal Right of Way, 55 feet from centerline of drain. There is to
be no obstructions, fences, buildings, walk paths, etc. within right of way.
Please be advised that NO change to or crossing of a District facility can take place unless a License Agreement or
Crossing Agreement between the District and the owner/developer of the property has been signed and recorded.
Please contact the District's Attorney, Scott L. Campbell, in writing if you need to obtain such an agreement. His
contact information is: Scott L. Campbell, Moffatt Thomas garrett noik & Fields, Chtd., 101 S. Cafitot Blvd., 1oth
Floor, Boise, ldaho 83702, phone: (2O8)345-2000, fax: (208) 385-5384.
A License Agreement or Crossing Agreement must be written up and recorded at the expense of the Developer
and/or owner. All agreements must be reviewed by and approved by Mr. Campbell. The least expensive way to
have an agreement drawn up which meets the need of the District is by having Mr. Campbell himself draw it up.
Otherwise there will be two attorney fees for said developer and/or owner to pay. A deposit of $1000.00 must be
paid to Moffatt, Thomas to cover the attorney fees before the work can begin. Any unexpended portion of the
deposit will be refunded. Pioneer lrrigation District will recommend disapproval of the final plat approval, until the
agreement has been executed and recorded. lf construction begins without the required agreement, Pioneer
lrrigation District will pursue judicial relief to stop the construction.1 \H3
O t
Plans must be received by Pioneer lrrigation District by Decembqf 1stn, 2OlO. All construction which mayimpact District facilities must be completed prior to the March 15rh,2Oi1deadline. The construction time-frame which Pioneer lrrigation District altows is November ltt of the current year to March isth of thefollowing year.
Ten percent (10%) of the PID project costs, as determined by Pioneer lrrigation District's engineer, shall be
deposited with Pioneer, in the form of a cashie/s check, paylUte to PioneLr lrrigation Distric[ at the time of
execution of the agreement by the Developer/Land Owner. Pioneer shall refund this deposit if the construction is
completed by March 15'n, and in accordance with the terms of the agreement, otherwise the deposit shall be
forfeited to Pioneer lrrigation District.
lf construction is not completed by March 1sth in a manner which allows for adequate delivery of water, Pioneer will
intervene and perform whatever work is necessary to allow adequate delivery of water to pations. This work will beperformed at the convenience and discretion of Pioneer lrrigation District. The DeveloperTLand Owner shall pay the
costs of this remedial work.
Any proposed development which will have downstream waterusers using gravity flow irrigation must develop their
irrigation system in a manner which will insure the downstream wateruserJ tfre
-aOitity
to icquire at least as much
irrigation water for gravi$ flow irrigation as what they received prior to any development or construction takingplace' The gravity flow irrigation system must be totally separate from the proposed pressurized irrigation systefi
within a subdivision.
Please be advised, the developer shall submit detailed drawings of any proposed relocations of Pioneer lrrigation
District's facilities, prior to preliminary plat approval. Any said relocations are subject to approval from the
Superintendent and/or the Board of Directors of Pioneer lrrigation District
Any construction that impacts Waters of the United States may require obtaining a 404 permit from the Corp of
Engineers. Greg Martinez of the Corp of Engineers can be contacted a1345-2154.
Prior to finalization of any Agreements with Pioneer lrrigation District, Pioneer lrrigation District must receive a copy
of a 404 permit that has been properly executed. lf it is determined by the Corp o1 Engineers that a 404 permit is
not required, Pioneer lrrigation District must be notified in writing by the Corp of Engineers that said 404 permit is
not required.
NOTE: This letter does not authorize any construction to commence until all the necessary agreements
with Pioneer lrrigation District have been executed and recorded.
lf you have any questions or comments, please do not hesitate to call.
Sincerely,
/r/y"i{
Mark F. Zirschky
Assistant Superintendent
2
cc: Tiffiny Hudak - Moffatt, Thomas via email
o oApril Gabello
From:
Sent:
To:
Subject:
Laura Harden
Monday, August 16, 2010 11:57 AM
AprilCabello
RE: Change of Hearing Date - SUB/PUD-205P-10 Whitney Springs new preliminary plat
We have 13 liens on properties in Whitney Springs. l've also rewritten up several
properties (empty lots) again.
This is from a previous email I sent to Anne Marie
Case #SUBIPUD-205P-10
Also reference Whitney Springs. I wrote up several lots out there. CBH homes finally
got all of theirs cleaned up. I did abate 13 lots belong to B&H Development and OLM
Homes.
Thanks,
Laura
(208) 4554596
----Original Message-----
From: Chelle Sperry
Sent: Monday, August 16, 2010 7:37 AM
To: Laura Harden
Subject: FW: Change of Hearing Date - SUB/PUD-205P-10 Whitney Springs new preliminary plat
I don't know if you got this hard copy or not so l'm sending it to you in case we have any liens
Chelle
-----Original Message-----
From: AprilCabello
Sent: Friday, August 13, 2010 3:40 PM
To: Robb MacDonald; Dennis C. Wilson; Adele Adams; Frank Wyant; Chelle Sperry; 'ggrant@vallivue.org';
'info@pioneerirrigation.com'; 'rick@ctcbus.com'; 'Brad Carpenter'; 'Walz, Don'; 'mishelle.singleton@intgas.com';
'rq uarles@caldwellschools.org'
Subject: Change of Hearing Date - SUB/PUD-205P-10 Whitney Springs new preliminary plat
Hello,
Please see the attached Public Agency Memo with the new hearing date.
Thank you,
April Cabello
City of Caldwell
Planning & Zoning Dept
208-455-4667
1
0o't
oo
To: Anne Marie Skinner
Senior Planner and
Development Team Leader
Date: 08/0412010
Re: SUB/PUD-205P-10
Whitney Springs Subdivision #3
This office has no objections to this preliminary plat/ LUA as it is presented. Fire hydrant locations
(generally 300' apart) and other particulars will be determined in subsequent phases. At this time the
requested street names in this petition have been approved and reserved however this cannot be considered
a guarantee that they will be available in the future. Dead-end streets in excess of 150' shall have an
approved turn-around.
Respectfu lly submitted,
Dennis C. Wilson
Fire Plans Examiner
flI+-\