HomeMy WebLinkAboutPublic AgencyPUBLIC AGENCY ITEM DATE SUBMITTED BY r i a, /v W Memorandum To: Senior Planner From: Robb MacDonald, Assistant City Engineer Tim King, Engineering Department Re: SUB PUD-06(P)-13 ZON-90-13 Weston Pointe #5 Date: July 26, 2013 The Engineering Department provides the following comments on a request by Cory Barton, Trilogy Development, and Scott Noriyuki for preliminary plat approval for Weston Pointe #5 Subdivision, consisting of 56 single-family residential lots and 5 common lots, and a rezone of approximately 17.10 acres from R-1 Low Density Residential to R-2 Medium Density Residential. The subject property is located approximately 801 feet north of Homedale Road and approximately 1761 feet east of Lake Ave. Development Plans Development Plans — Prior to commencing construction, plans must be prepared by the developer's engineer and approved by the City Engineering Department which shall include the following items: a. Street section and alignment (including curb and gutter); b. Sidewalk (4 foot on local streets); c. Sanitary sewer (per City and DEQ requirements); d. Potable water (per City and DEQ requirements); e. Stormwater facilities (per City requirements/manual); f. Street lighting (per City standards); g. Street signage (per City and MUTCD requirements); h. Vertical Datum based on NAVD 88 Datum. General 1. Easements for Utilities shall be 10 feet wide minimum along all front and rear lot lines. A minimum10 feet wide easement along select interior lot lines shall be provided to facilitate pressure irrigation. Page 1 of 5 i� 2. Appropriate easements for emergency access, transmission lines and/or other utilities shall be clearly indicated, with recorded instrument numbers provided for said easements, on the face of the final plat (visually and in writing). 3. All utilities on and within the boundaries of the subdivision shall be located and/or relocated underground. 4. All street, sewer, water, fire protection, and street light facilities must be dedicated to the City. Some conveyance facilities for stormwater drainage may be eligible for dedication to the City. 5. Construction of facilities to be dedicated and/or within public right-of-way shall be performed by an appropriately licensed public works contractor and constructed to City of Caldwell specifications. 6. Prior to commencement of construction in any dedicated right-of-way, or construction of any improvement intended for dedication to the City or connected to a City facility, the City Engineering staff is to be notified. This preferably will take place in a pre -construction conference scheduled by the engineer of record in which all appropriate personnel and utilities are present. Appropriate City personnel are to be notified in advance of all testing (including compaction, pressure and coliform, etc.) and given opportunity to be present during conduct of the testing. The engineer of record or his designated representative is to witness all tests and a log of inspection visits and testing results is to be kept by the engineer of record or his representative. 7. The developer is to employ a responsible design professional, preferably the engineer of record, to oversee and inspect construction, to perform and/or observe all requisite testing of completed facilities, and to certify that improvements have been constructed according to approved plans and in compliance with applicable City, State, and Federal standards. 8. The engineer of record shall be held responsible to ensure that subdivision improvements are in substantial compliance with said engineer's design. Following the construction of the subdivision improvements, the developers engineer shall provide the City of Caldwell Engineering Department with electronic dwg. format record drawings spatially referenced to the Idaho State Plane Coordinate System -West Zone, North America Datum (NAD) 83. Vertical control shall be referenced to the North America Datum (NAVD) 88 for future reference and to establish that the engineer of record has caused construction to occur in substantial compliance with the design of said engineer of record. 9. Any note, item or drawing element on the plats, construction drawings, engineering drawings and/or design drawings related to the property inconsistent with City Codes, Policies and/or Ordinances shall not be construed as approved unless specifically addressed and granted by City Council. Rights -of -Way 1. The applicant shall dedicate as public right-of-way a minimum fifty-six (56) full width right-of- way along all proposed local public streets. 2. A note shall be placed on the Final Plat indicating that all rights -of -way are to be dedicated to the public. Page 2 of 5 Street 1. The applicant shall improve all local public streets to include a minimum 37.0 full width street section back of curb to back of curb. The streets shall feature standard rolled curb or 6" vertical curb and gutter, 4 foot sidewalks, sub -base and asphalt paving, required storm water drainage facilities and streetlights_ Traffic Mitioation Water 1. All on site water mains will need to be looped into existing mains for fire flow and water quality purposes. Internal main sizing and construction plan approval, will be dependent upon the availability of fire flow. 2. Each buildable lot shall be supplied with potable water. The location of water service, including sizing of mains, providing of easements, frontage construction, and offsite construction are to be decided during review of improvement plans. This development will be required to comply with the Water Master Study. 3. Water is available from 8-inch lines at the Weston Pointe No. 4 Subdivision stub streets of Landsdown Ave. and Hargrove Ave. along the southerly boundary of the proposed development. Sanitary Sewer It shall be the responsibility of the applicant's engineer to verify that connection to existing sewer mainlines will not exceed the functional capacity of said mainlines. Provision for connectivity by future developments shall be met in accordance with current City standards. 2. The nearest sewer is an 8" line within the proposed development boundaries The location of sewer service, including sizing of mains, providing of easements, frontage construction, and offsite construction are to be decided during review of improvement plans. This development will be required to comply with the Southeast Trunk Sewer Study as updated. 3. The applicant will be required (where applicable) to extend all sewer and water mainlines to the center of adjacent roadways for connectivity by future developments. Locations of said extensions will be decided during the review of the improvement plans. 4. Each buildable lot shall be provided with individual sewer service. 5. Any easements for sewer lines not in the right-of-way should be at a width sufficient to construct same and not less than 20 feet in width. Easements for adjacent sewer and water Page 3 of 5 lines not in the right-of-way shall be at a width sufficient to construct the same and shall be no less than 30 feet in width. 6. All weather surfaces may be required adjacent to mainlines that fall outside the public right-of- way. All weather surfaces shall be constructed sufficiently to support heavy equipment necessary to construct and maintain sewer under all seasonal weather conditions. Irrigation The Preliminary Plat shows the Forest Canal running along the southwesterly boundary and the Deer Flat Well Canal running along the northeasterly boundary of the proposed subdivision. Existing easements and/or right-of-ways for the canals and any other irrigation facility shall be determined and clearly indicated on the construction plans and on the final plat (excluding prescriptive easements). Construction across or re-routing of these facilities is subject to approval by the Pioneer Irrigation District and at their discretion, their assigns. 2. The developer shall maintain any existing upstream drainage rights and downstream irrigation rights across the property. During the design phase of this project, the developer or his engineer is to contact the appropriate irrigation district to help ascertain these rights. Appropriate facilities shall be provided by the developer to convey irrigation and drainage water across the property to take care of these offsite needs. There is to be no discharge of gravity irrigation return water into the subdivision storm water system. 2. The development is to include a non -potable water pressure irrigation system. The design of this pressure irrigation system is to be reviewed and approved by the Caldwell Municipal Irrigation District prior to construction plan approval. It shall be required that the system will be operated and maintained by the Caldwell Municipal Irrigation District. 3. Pump stations shall be located in a platted common lot with a recorded perpetual easement sufficient for convenient access and maintenance of said pump station. The lot shall be owned and maintained by the home owners association. 4. Each lot shall be provided with a pressure irrigation service. 5. All pressure irrigation mainlines shall be located on private property excepting at street crossings, and within a public utility easement of a minimum of 10 feet in width centered over said mainlines. 6. The applicant shall ensure that an adequate continuous irrigation supply flow is available to meet the pressure irrigation system requirements. 7. Supplying irrigation district shall approve the location of the delivery point. 8. The applicant shall transfer a proportionate share of any existing water right(s), except those held in trust by an irrigation district, to the City of Caldwell for both irrigation and domestic water supply for the subject development. If this should occur, The City shall assist in registering the transfer. Page 4of5 9. Irrigation facilities shall be located outside the public -right-of-way and shall be moved, adjusted and/or improved as necessary to facilitate required street improvements. Storm Drain As noted previously, provision is to be made for the disposal of stormwater drainage in accordance with the City Stormwater Management Manual and any updates adopted subsequent to this application. It is to be noted that retention designs will be denied in most instances. A copy of this policy is available upon request. The engineer of record is to provide calculations, which indicate that the assumptions in his stormwater drainage plan comply with the requirements of the stormwater manual 2. The applicant shall identify and retain all historical drainage discharge points from the property for the purpose of draining on site storm water detention facilities. 3. The final plat drawing should indicate that storm water detention basins are to be placed in common lots in accordance with the referenced Stormwater policy. A note should be placed on the final plat indicating that all areas designated as common areas are to be operated and maintained by the business owners association. Plat Prior to approval of the final plat, subdivision facilities must be completed or an appropriate construction security provided. There may be temporary restrictions to the obtaining of building permits, even with acceptable construction security, depending on fire protection, emergency service requirements, and City approval of the sanitary sewer system. A 50% temporary restriction to obtaining of building permits will be enforced until all facility construction has been completed, inspected and certified by the developers engineer including all punch list items. 2. Upon recordation of the plat, the Engineering Department is to be provided with a reproducible Mylar copy of said document, suitable for blue line reproduction. 3. An electronic (dwg.) copy of the Final Plat suitable for mapping and addressing purposes will be required with Final Plat submittal. Page 5of5 MEMO Date: June 19, 2013 To: Robb MacDonald, Engineering Department Andy Cater, Fire Marshal Brett Clark, Building Department Frank Wyant, Police Department Caldwell School District Vallivue School District Brown Bus Co. Caldwell Transportation Pioneer Irrigation From: Anne Marie Skinner, Senior Planner Caldwell P & Z Department 4 RE: Case Number SUB-06(P)-13 ZON-90-13 (Weston Pointe #5) Attached please find a land use application that you are invited to review. This case is scheduled to be presented before the Caldwell Planning and Zoning Commission on Tuesday, August 13, 2013 at 7:00 pm. Case No. SUB-06(P)-13 ZON-90-13 a request by Corey Barton, Trilogy Development, and Scott Noriyuki for a rezone from R-1 Low Density Residential to R-2 Medium Density Residential and preliminary plat approval of Weston Pointe Subdivision No. S consisting of approximately 17.10 acres located approximately 801 feet north of Homedale Road and approximately 1761 feet east of Lake Avenue. Please review the attached application and information and provide me with your written input. I request that you e-mail any comments to me as soon as possible but no later than Thursday, August 1, 2013. E-mail: amskinner(dci.caldwell.id.us I will assume that you have no objections, concerns or comments if you do not reply to this request within the requested timeframe. If you have any questions, you may contact me at 455-4662. ,IVILt' IDAHO CODE 22-4503, IGHT TO FARM ACT, WHICH kL OPERATION OR AN APPUR ANCE TO IT SHALL BE OR IVATE OR PUBLIC BY ANY CHANG('CONDITIONS IN OR NON AGRICULTURAL ACTIVITIES AFTER THE SAME HAS BEEN THAN ONE (1) YEAR, WHEN THE OPERATION BEGAN; PROVIDED )F THIS SECTION SHALL NOT APPLY WHENEVER A NUISANCE ROPER OR NEGLIGENT OPERATION OF ANY AGRICULTURAL -NANCE TO IT." ;NOWLEDGE, THIS PRELIMINARY PLAT MEETS ALL REQUIREMENTS OF CITY OF CALDWELL. camweii Fire uepartment _ .... APPROVED (See Plan Review f,,-,�,.►. ;'. ` Reviewed and a' Plan Examiner �I Date: & t to la CURVE TABLE RADIUS TANGENT DELTA CHORD BEARING CHORD LENGTH 36.68' 13.77' 41'09'03" N V46'34"E 25.78' 56.00' 28.00' 28.00' 18.50' 18.50' 5.50' R 2x I 2X I I I NOTE: PAVEMENT SECTION PER GEOTECHNICAL REPORT RECOMMENDATIONS. A TYPICAL 56' STREET SECTOIN SCALE N T S. LOPER ' DEVELOPMENT . TITANIUM PL N, ID 83642 +5-8858 CIVIL ENGINEER SCOTT WONDERS, P.E. J—U—B ENGINEERS 250 S. BEECHWOOD AVE. SUITE 201 BOISE, ID 83709 208-376-7330 1..,L-�W -: PER CSS SD-702 LAND SURVEYOR M z O� C/) Q ID � m� Q z W � H z J OW 0L fr zCI- O C!) W FILE : 10-13-037 PPOI JUB PROJ. # : 10-13-037 DRAWN BY: EE DESIGN BY: CHECKED BY: DOC AT FULL SIZE, IF NOT MICHAEL BYRNS, P.L.S. LAST CH. SCALE D: 512C-COR J—U—B ENGINEERS 2/2013 250 S. BEECHWOOD AVE. SHEET NUMBER: SUITE 201 BOISE, ID 83709 ❑ ❑ O 1 208-Y 376-7330 i 1 i 0-- W O' U z Q z O m