Loading...
HomeMy WebLinkAboutPublic AgencyaD PUBLIC AGENCY ITEM DATE SUBMITTED BY tL+V ub e loU ,tttt+k-*."??*4,Lr/nJt.rg<,1*-b,41 I {ft-L vtn-.^:,1-1'ar=G" (*v tb^LJ..^) on/)-l'ui nG ?{t- rl oO Caldwell Fire Depaftment "Saving Laveg, Protecting Propefi" Fire Prevention Division 310 S. 7th Ave. Caldwell, ID 83605 Asst. Chief Doug Brown, Fire Marshal 208-4ss-3032v. I 208-4ss-3014 F. SUBDIVISION PLAN REVIEW THE 2003 EDITION OF THE INTERNAIONAL FrRE CODE (rFC) GOVERNS THrS PROJECT. Date: Jdy 25,2005 To: W&HPacific,Co. From: Douglas Brown, Assistant Chief / Fire Marshal Subject: Plat Review for Weston Pointe Sub. # 4 North of Homedale Rd. and East of Lake Ave., Caldwell THE FOLLOWING CONDINONS OF APPROVAL ARE REQUIRED TO BE AGREED UPON BY THE APPLICANT PRIOR TO RECORDATION OF A FINAL PLAT MAP. OTHER CONDMONS OF APPROVAL APPLY PRIOR TO AND DURING CONSTRUCTION ACNVITY. Proiect Summary: Proposed Use: Occupancy classification: Number of lots: Type of Construction: Required Fire Flow: Single Family Residential Subdivision R-3 Approximately 96lots Type V-B 1,000 GPM minimum General: The CFD has previously met and discussed this project with the Applicant(s) and city staff. This project generally complies with all CFD requirements except as indicated below under itemized conditions. Any deviation from approved plans, which requires further review, and approval of the Fire Marshal. New conditions or requirements may be imposed as the result of any changes or exceptions. All conditions noted in this plan review pertain to this project, to and through its completion and intended use. I lF Revised: 6-1-05 o Itemized Conditions: 1. Acceptance of water supply for fire protection is contingent upon acceptance of the water system by the City Engineer and DEQ. 2. All required fire hydrants are to be installed and fully operating prior to any combustible materials being brought on site. Hydrants to meet or exceed City of Caldwell standards. 3. Secondary access is not an issue wit Duke Street providing connectivity between Landsdown Ave. and Hargrove Ave. 5. The roadway names that were submitted by the Applicant on the preliminary plat map dated 4-28-05 has been accepted as reflected in the list below, such that it conforms to the city's street naming ordinance and policy. The approved roadway names shall be used on all future maps and submittals. SUBMITTED NAMES APPROVED LANDSDOWN AVENUE GLIMARY COURT HARGROVE AVENUE The following submiued roadway names are changed because they do not meet Caldwell roadway naming standards. They have been re-assigned names as follows: SUBMITTED NAMES REASON CHANGED CHANGED TO o QUEENSBRIDGE STREET QUEENSBRIDGE COURT CAMBRAY COURT too long improper suffix/ too long sound alike DUKE STREET DUKE PLACE CAMPO COURT 6. Locate and install eight (8) new fire hydrants as follows: NE corner of Homedale Rd. and Landsdown Ave. East side of Landsdown Ave. between lots 5 and 6, Block 9 NE corner of Landsdown Ave. and Duke St. North side of Duke St. between lots 6 and 7, Block 8 Revised: 6-1-05 4. If applicable, no "raised" (curbed and/or landscaped) medians will be allowed in roadways where they create islands, exceot-for the entry on Landsdown Ave. and Hargrove Ave. q{f qf Homedale Rd. However, roadway-level bricks, stamped concrete or compressed (rolled or tamped) gravel may be substituted for medians, where a median- like design is desired in lieu of raised medians. In some cases rolled-curbing with grade- level landscaping (grass over turf blocks) may be allowed on medians. The other exception would be if there are no less than twenty foot (20') wide roadways located on both sides of the median (a common entry roadway design for subdivisions). 2 o NE corner of Duke street and Hargrove Ave. North side of Glimary Ct. between lots 24 anil25, Block 9 East side of Hargrove Ave. between lots 6 and TrBtock l0 NE corner of Homedale Rd. and Hargrove Ave. 7. A minimum required fire flow of 1,000 GPM is required from each fire hydrant. 8. Street name signs must be installed prior to any combustible construction materials being brought on-site. 9. Distinct and legible "temporary" addresses for any structure under construction shall be posted and maintained until such time as pennanent address numbers are installed and posted on the structure. 10. All-weather access roadways with twenty-feet (20') of unobstructed width are to be installed and made drivable glor to any combustible construction materials being brought on-site. 11. All dead-end roadways constructed as a part of this project are required to have turnarounds that are 100' diameter, per CFD standards. 12. The Applicant(s) shall carefully instruct all contractors and sub-contractors on this project of the importance of fire and life safety on the job site. The following requirements apply on all construction sites: o Fire hydrants must not be obstructed or blocked by vehicles, construction materials, weeds, realty signage or debris at any timeo All roadways, tumarounds and'osecondary access" roadways must be kept clear of weeds, unattended construction equipment, building materials, sub- contractors personal vehicles or delivery vehicles at all timeso Temporary addresses (and/or street name signage) must be visible at all timeso There shall be absolutely NO open burning (warming fires) at any time. Any "hot work" on or in structures requires appropriate fire protectiono Debris and scrap materials shall be cleaned up regular,/H inside and outside, of structures and hauled to the dump 13. Applicants and their engineering firms are cautioned to seek out and receive a CFD approval stamp and sign-off on all "final" plat maps before submitting them for recording to Canyon County. This is to ensure that all conditional items and roadway names are properly shown and all conditional changes have been made correctly. NOTE: The responsibility for assignment of addresses is a function of the Caldwelt Mapping Department headed by Dave Marston. No addresses for building permits will be issued until such time as they have been provided with a stamped copy of the final recorded plat map for this subdivision. o 3Revised:6-1-05 o 14. New "as built" master plat maps shall be submitted with each new phase submittal that will show, to the same scale, all phases previously built. Failure to do so will result in the plans being rejected until such maps are provided. Such maps shall clearly identify and show all phasing lines, a vicinity map that shows interconnectivity with all adjoining parcels and surrounding roadways (including other subdivisions), actual fire hydrant locations in all prior constructed phases, approved street names, block / lot numbers and assigned address numbers for all previous phases. The dimensions and square footage info of lots may be omitted on these maps to make room for and improve the clarity of the other required information. The CFD looks forward to working with the Applicant and their representatives on this project. For funher clarification please contact the CFD Fire Marshal at2081455-3032. DouqlnsBroww Douglas Brown Assistant Chief / Fire Marshal o 4Revised: 6-1-05 oO Memorandum Re: Date: Brian Billingsley, Sen,ior Planner Gordon Law, City Engineer %' T.J. Frans Engineering Tech I - SUB-46 (4) F-00 Weston Pointe Subdivision No.4 August 7,2006 The Engineering Department has reviewed the proposed final plat for Weston Pointe Subdivision No. 1 and provides the following comments regarding the project and the submitted final plat: The water system is not operational. The water system has been constructed, pressure tests have passed but water samples have failed. The final plat will not be signed, and no building permits will be issued until this emergency requirement is complete. 2. All weather surfaces are in place. Compaction test results for the roadways have been submitted to the City for review and approved. 3. Street signs have been installed 4. Sewer system is operational. The line has been constructed, pressure tests have been approved, and video has been received. 5. Construction security will have to be provided for those items not yet completed prior to signing of the final plat. The city has not agreed on a bond amount for those improvements not yet constructed. 6. The final plat drawing shall be corrected in accordance with the marked-up copy done July 7 ,2006 and mailed to W&H Pacific on July 7 ,2006. 7. ln an effort to expedite the addressing process of the final plat, the City is asking that an electronic copy, in AutoCAD format, be returned with the revised copy of the final plat. \$Page 1 of 1 il To: From: 08/27/2006 16:21 FAX 2084594491I PIONEER IRRIGATION + CALDTYELL P Z @ ooro Pioneer Irrigation District JEFF SGOTT Superintendent MARK ZIRSCHKY Asst. Superintendent P.O. BOX 426 . CALDWELL, IDAHO 83606 (208) 459-3€1 7 NAIDA KELLEHER Secretary-Treasurer June 26, 2006 City of Caldwell Community Development Department Fax: 455-3050 Attn: Brian Billingsley Re: Case No. SUB-46(4)F-00 (Weston Pointe 4 - Final Plat) TO WHOM IT MAY CONCERN Please be advised that all District right of ways and easements must be recorded on the fina! plat. Elijah Drain has a 110 foot federal right of way, 55 feet from centerline of drain- There is to be no obstructions, fences, buildings, walk paths, etc. within said right of way. Stone Lateral has a 20 foot easement, 10 feet from centerline on each side of pipe. Note: Drawings submitted to Pioneer lrrigation District within the final plat application package note the "Steven$ Lateral". This must be changed to the Stone Lateral. !f you have any questiorrs, please feel free to call, Since Mark F. Zirsch Assistant Superintendent ?k- |