Loading...
HomeMy WebLinkAboutPublic Agencyrr - PUBLIC AGENCY ITEM DATE SUBMITTED BY I -o -2- 5 I i jLI I kr 5 1 (office of C11t#ia �ngimeer Fubfir Parks Pirertar �t . GORDON N. LAW, Q.E. City of Caldwell P.0, Box 1177 Caldwell. Idaho 83606' V 77 BUS :08/455-3006 November 30, 2004 Wyatt Tustin 5121 Weston Avenue Caldwell, ID 83607 RE: Storm Water Management Area Weston Point Subdivision No. I Dear Mr. Tustin, CITY OF CALDWELL 621 Cleveland Blvd Caldwell. Idaho 83605 PHONE (208) 455.3000 FAX (208) 455-3012 The City of Caldwell Engineering Department has witnessed the recent re -construction of the storm water management area in your subdivision. Please refer to the attached picture, taken on November 24, 2004. It is our belief that the storm water detention area should function properly now that it has been rehabilitated. The Engineering Department will continue to monitor the pond to ensure that it is functioning properly. For most storm events, the detention area should drain within 48-hrs. For major storm events, the detention area should drain within 144-hrs. The detention area should not continuously hold water. Minor grading, hyroseeding, and sprinkler system work as necessary will be completed by this spring. Once all of this work is completed, the storm water detention area should satisfy the original design intent, and also function as a useable common area. Please do not hesitate to contact Ben Weymouth or Scott Woods at the City of Caldwell Engineering Department should you have any further questions or concerns. We can be reached at 455-3006 during normal business hours. T ly,, vk4; ` Ben L. Weymouth, P.E. Assistant City Engineer Cc: Mayor Nancolas Kevin Amar, Heartland Development Steve Hasson, Community Development Director File 19.95-170(b) Memorandum To: Steve Hasson From: Gordon Law, City Engineer ik�' Y� Re: SUB-46(1)F-00 Weston Pointe No. 1 Dyver Development LLC Date: October 24, 2002 The Engineering Department has reviewed the proposed final plat for Weston Pointe Subdivision No. 1. The department provides the following comments on the submitted final plat: 1. The water system is not operational. Approximately 1420 if of offsite water main has not yet been constructed. 2. The sewer system is not operational. Approximately 972 if of offsite sewer main has not yet been constructed. 3. The roadways do not yet meet City standards as an all weather surface for emergency vehicle access. No sub -base or base material has been installed. 4. Street signs have not yet been installed. 5. The plat will not be signed and building permits will not be issued until the preceding items (No. 1-4) have been completed. The developer has indicated that these improvements will be complete by the date of this hearing, November 4, 2002. 6. The City has not received approval letters from Pioneer Irrigation District for the pressurized irrigation system or concurrence with the design and facilities that preserve existing irrigation rights. 7. The City has not received a letter of approval from the Idaho Department of Water Resources concerning extension of the channel structure and culverts in the Wilson Drain. 8. The City has not received a letter of approval from Black Canyon Irrigation District concerning the 8" sewer lateral crossing of the Notus Canal. 9. Construction security will have to be provided for those items not yet completed prior to approval of the Final Plat. A "Construction Punch List" has not yet been issued for this development. The developer has verbally agreed to bond for those improvements not yet constructed. DATE: October 25, 2002 TO: Steve Hasson, Community Development Director FROM: Douglas Brown, Assistant Chief 1 Fire Marshal SUBJECT: Comments For Caldwell City Council November 4, 2002 Meeting The Caldwell Fire Department (CFD) offers the following comments regarding the following cases to come before the Caldwell City Council on November 4, 2002: Case No: SUB-51(4)F-00 Applicant: Dyver Development, LLC Project: Southpark Subdivision No. 2, Unit No. 4 Location: South of Homedale Rd. and west of Indiana Ave. The CFD has previously commented and issued conditions of approval on this subdivision and has provided them with conditions of approval in a plan review dated August 1, 2002. Case No: SUB-46(1)F-00 Applicant: Dyver Development, LLC Project: Weston Pointe Subdivision No. 1 Location: North of Homedale Road and east of Lake Avenue The CFD has previously commented and issued conditions of approval on this subdivision and has provided them with conditions of approval in a plan review dated July 23, 2001. I Q� � CALDWELL FIRE DEPARTMENT CITY OF CALDWELL 310 South 7th Avenue AnWttng Your ProPeiV Saving Ewes CALDWELL, IDAHO 83605 (208) 455-3032 MEMORANDUM DATE: July 23, 2001 TO: Ms. Rita Earl, Earl & Associates Inc., Applicant CC: Mr. Steve Hasson, Community Development Director Mr. Steve Willcuts, Engineering FROM: Douglas Brown, Asst. Chief / Fire Marshal SUBJECT: Plan Review Comments for Weston Pointe Subdivision, Unit #2 The CFD has reviewed the subdivision plans for Unit #2 as submitted. The following conditions and comments apply to this subdivision - All -weather roadways must be installed and driveable prior to bringing any combustible building materials on site, including secondary access roadways. 2. A fire -flow of 1,000 gallons per minute at a residual pressure of not less than 20 PSI must be available from all fire hydrants. 3. Three (3) new fire hydrants are required for this phase. Fire hydrants are approved as located and noted on Sheet 2, with one exception. The hydrant shown on Ormsby Street between Lots 10 and 11 shall be relocated southward to a location between Lots 8 and 9. Hydrants shall meet Caldwell Water Department specifications. 4. Primary access to this project is available via either Weston or Ormsby Avenues, with the other serving as the secondary access. Secondary access for Unit #2 is achieved with the cross over of Aldbury Street. 5. Operational fire hydrants and temporary (or permanent) street signs are required before any combustible materials are brought on -site. 6. Acceptance of a water supply for fire protection is contingent upon acceptance of the water system by the City Engineer and DEQ for water quality. 7. One (1) temporary all-weather turn -around is required, and approved as shown on Sheet 1, at the north end of Ormsby Avenue. a 8. Addresses will be assigned upon recordation and receipt of the final plat map. The Applicant shall be responsible for the timely delivery of two (2) copies of the final plat map to the CFD for addressing purposes. 9. Temporary addresses are required for all lots and/or buildings under construction, from pouring of the slab until the installation of the permanent address numerals. Temporary addresses must be legible and distinct from other markings on the building. Permanent addresses shall be in numerals 6" tall. 10. The following street names shown on these plans are approved for Unit #2: Ormsby Avenue Weston Avenue Aldbury Street The CFD looks forward to working with the Applicant and their representatives on this project. Thank you. Douglas Brown Assistant Chief / Fire Marshal