G IDAHO OEPAFTMENT
OF HEALTH ANO WELFARE
DIVISION OF
ENVIRONMENTAL QUALITY
1445 North Orchard, Borse, lD 83706-2239, (208) 373-0550
December 27, 1996
Philip E. Batt, Governor
RE:
Planning & Zonng Director
City of Caldwell
PO Box 1177
Caldwell, ID 83605
File Numbers 96-07-ANN, 96-07-ZON, and 96-14-SUB
South Palrang Subdivision
Your Request for Comments Received December V|,1996
Dear Planning & Zonng Director:
Thank you for the oppornrniry to review the referenced project. We have the following general comments
Water Supply. If the project includes extension of public water distribution facilities, plans and
specifications must be submitted to this office for review and approval prior to construction. Lines that serve
two or more 'nits must be constructed to public works standards, in accordance with our recent Memorandum
of Understanding with the Idaho Division of Building Safety, Plumbing Bureau. We do not review plans for
individual service lines; those plans should be reviewed by the City Building Department.
)Wastewater Collection and Treatment. If the project includes extension of a public wastewater collection
system, plans and specifications must be submitted to this office for review and approval prior to
construction. Lines that serve three or more units must be constructed to public works standards, in
accordance with the Memorandum of Understanding. Plans for individual service lines should be reviewed
by the City Building Department.
Water Quality. We recommend that best management practices be implemented to control runoff during
the construction period. Permanent stornwater facilities should be desigrred according to our Guidelines for
the Treatmenl and Disposal of Stormwater Runoff, available free of charge at this office. Facilitits that
concentrate stormwater must be located at least 25 feet from water mains, and 100 feet from wells. We
recommend against the construction of sub-surface disposal systems, such as infiltration beds, because
subsurface systems (and thus the surrounding ground water) are vulnerable to road oils and greases, animal
wastes, accidental spills, intentional dumping, etc.
Please contact Bill Freeman at 373-0166 if you have questions regarding these comments.
|,
L. Palmer
Regional
Michael A.Freeman, DEQ-Boise Regional Office
Pinnacle Engineers, lnc
Source FiIe #24
Reading File
3
!
lA - I
c:
I
MEMORANDUM
To: Planning and Zoning Department
From: John Carpenter, Engineering Department
Date: January 6,1997
Re: South Palrang Subdivision
The department is in receipt of the proposed South Palrang Subdivision. We have
reviewed the proposed subdivision and make the following comments:
1. The developer proposes to install sidewalks, curb and gutter, pave streets (half
width + 7 l/2 ft on Palrang, and the area between existing edge of asphalt and gutter on
Montana). This proposal is consistent with City Policy and the department endorses the
developer's proposal.
2. The developer proposes to discharge predevelopment drainage flows into an
existing ditch. Approval to discharge into the ditch is needed from Pioneer Irrigation
District.
3. The developer proposes retaining stonnwater runoff on site. The specific
requirement for stormwater retainage is twenty-five year, twenty-forx hour duration
storm.
4. The developer's Engineer has indicated right-of-way on Palrang, Oregon,
Montana Ave. This is to be dedicated to the public.
5. The developer is proposing to connect and extend Ciry water and sewer to the
proposed site. This proposal is consistent to City policy and department supports the
developer's proposal.
6. The developer is proposing not to construct sidewalk, curb and gutter along
Montana and Oregon Ave. To be consistent with City policy we will require sidewalk,
curb and gutter along Montana Ave.. We previously agreed with the developer's
Engineer to not require sidewalk, curb and gutter along Oregon, south of Palrang. This
agreement was made based on the condition that this part of Oregon Ave. is not being
opened
e
FVrL
I o
7. The developer's Engineer has indicated the extension of City water from
Idaho/Palrang to Oregon/Palrang with a 6" main. The City water plan requires an 8"
main.
8. The developer proposes providing flood irrigation to individual lots. the
developer will also need to obtain the review and approval of Pioneer Irrigation Disrict.
9. The developer shall be required to install street lights as per city and Idaho Power
standards.
In reviewing the preliminary plat for the above said Subdivision, the department
recognizes that it contains information that is typically submitted with improvement
drawings. These comments do not replace the regular improvement plan review process.
2
CANYON HIGHVyAY DISTRICT No. 4I 1s435 HIGHwAY 44
CALDWELL, IDAHO 83605
a
TELEPHONE 208/454-8 r35
FAX 208/454-2008
Januery 9, 1997
City of CaIdreII
Plannlng and Zonlng
PO Box LL77
CaldrelI, ID 83608
Re: South Palrang Subdivision
Gent lemen:
Cenyon Highvey Dietrict Ho. 4 hae revieued the prelirinaryPlat for South Palrang Subdivision, Ue find ye cennot concur andesk thet you deny said eubdivigion.
It appeara your ennexation incLudee only the property and notPalreng Drive. He believe thie is a dir.ect addition to theexieting gubdivieion and ehouJ.d reguire a replat, lle aleo beLievePalrang Drive ie in the juriediction of our highray dietrict. Inorder to open thie roadray to the public, ye rould reguire econplete road section buil.t to our standards,
He vill evait your decision to replat or' aDnex the corpleteexisting euhdivieion (Pelrang and c.ountry Acres llo, zr.
si
Sid Bright
Bork Director
sB/J r
Pq)
l)ls't'tilC't'
gl
,,r^
a a
@ffire st @ngpngirraer&
ffifiLicW"rh"pirer/,or
GORDON N. LAW, P.E.
City of Coldwell
P.O. Box I 177
Coldwell. ldoho 830&l 177
BUS. 208/455-3006
May 1, L997
ctw oF cALDwE[t
62,l Clevelond Blvd.
Coldwell, ldoho 83605
PHONE (208) 4553000
FAX (208) d55-3m3
Pinnacle Engineers, Inc.
At.tn: John Carpenter, E. I . T
870 N. Linder, Suite B
Meridian, Idaho 83642
Re: South Palrang Subdivision
Dear John,
The City of Ca1dwe1l has reviewed the following plans for the
above referenced project (including water, sewer, & street
designs) and stamped t,hem "APPROVED" :
South Palrang Subdivision
Project No. 96528
Latest Revlsion Date: 04-30-97
Drawing Sheets 1--1-2
This "APPROVAL" constitutes accept,ance of the design by the Cit.y
of Ca1dwe1l. Final PIat approval is conditional upon consLruct.ing
in accordance with the above menLioned approved pIans.
Sincerely,
Gordon N. Law, P.E.
Ca1dwell City Engineer