Memorandum
To: Emma Hill, Associate Planner
From: TJ Frans, Project Manager
Steven Pendleton, Civil Plans Examiner II
Re: SUP22-000010 King Duplex
Date: July 5th, 2022
The Engineering Department provides the following comments on a request by Gene King to
construct a 2-story duplex on parcel R04757 (0.14 acres) in the Central Business District zone
at 1106 Arthur Street (formerly 1108 Arthur) in Caldwell, ID. This property lies within the Indian
Creek Corridor.
General
1. The Engineering Department does not have an issue with this request. Applicant shall
complete the full width sixteen feet(16') paving of the alley way to the south boundary of said
parcel. The alley shall be constructed in a manner that will convey the storm water back to
S.11th Avenue.
2. Applicant shall replace any dilapidated curb, gutter, or sidewalk along the frontage of said
parcel to be determined by the City of Caldwell Engineering Dept. at the time of construction
onsite.
King Duplex
SUP22-000010
Page 1 of 1
���`