HomeMy WebLinkAboutPublic AgencyITEM DATE SUBMITTED BY
pA-r rla\\iv a<, Etnai 1
6t'' Qonce(\\\)la)l at ?,4,
PA-2 ?rrg [{\erno r /alAn rF!
PA.3
PA-4
c
o Lisa Boyd, Superintendent
5207 S. Itriontana Avenue
Caldwelt, lD 83607
Phone (208)454-U45
Fax (208) 454-0293School District #139
Re: SUP21-000013 Latitude 96 Apartments
To Whom !t May Concern:
The Vattivue School District has reviewed Case No. SUPZ1-000013.
The chitdren within this property witt attend the fottowing schoots:
o Skyway Elementary School
o Summitvue Middle School
o Vallivue High School
We DO have concerns about capacity at Skyway Etementary and Va[livue High schools at this time.
These schoots are currently over buitding capacity with the current enrottment. Due to high
enrottment districtwide, Vattivue School District does not attow open enrotlment for students
residing outside district boundaries.
lf this request is approved, we encourage the devetopment of sidewalks and street tighting to
attow for safe watking to school or the bus stop
We have ongoing concerns regarding devetopment proposats and approvats due to the
compounding impact they witt have on our schoots. For exampte, in addition to the Latitude 96
Apartments, Vattivue High Schoot witt be greatly impacted if the Sotstice Subdivision of 100
homes is atso approved. Ptease take this into consideration when making your decision.
Sincerety,
Lisa Boyd
Superintendent
?ft -\"Preparing lndividuals for Success Through Education"
Memorandum
To:
From:
Re:
Date:
Emma Hill, Associate Planner
TJ Frans, Project Manager
SUP21 -00001 3, Latitude 96 Apartments
January 21,2022
The Engineering Department provides the following comments on a request by Bryan Wilson fpr a
Special Use Permit for Latitude 96 Apartments, a multi-family housing development located at
4120E. Ustick Road, Caldwell, ldaho.
* Due to the natLtre, complexig and many civil improvements required of mufti-family land
development prqjects the Engineering Depaftment recommends that this project be required to
complete the land developmenf process in the same manner as a standard subdivision and that
said recommendation be made a condition of approvalof this application.
Develooment Plans
1. Development Plans - Priorto commencing construction and applying for building permits,
plans must be prepared by the developer's engineer and approved by the City Engineering
Department which shall include the following items:
a. Street section and alignment (including curb and gutter);
b. Sidewalk (sidewalk width based on street classification);
c. Sanitary sewer (per City and DEQ requirements);
d. Potable water (per City and DEQ requirements);
e. Stormwater facilities (per City requirements/storm water manual);
f. Street lighting (per City standards);
g. Street signage (per City and MUTCD requirements);
h. Vertical Datum based on NAVD 88 Datum.
Latitude 96 Apartments
suP21-000013
Page 1 of6
?h-l
General
1. Applicant shall follow the requirements and processes of the subdivision ordinance for the
development of this project. For the purposes of this project, all conditions outlined in the
subdivision ordinance pertaining to receiving the City Engineers signature on, or the
recordation ol a final plat shall be applied to the submission of building permits.
2. Easements for public utilities shall be as listed below. Easements will be required to be larger if
deemed necessary by the City Engineer in order to facilitate future maintenance operations of
utilities.
a. 10 feet wide minimum.
b. Domesticwateronly,l5feetwide minimum
c. Sanitary sewer only, 20 feet wide minimum
d. Sewer and water combined, 30 feet wide minimumi. Note: future permanent structures will not be permitted to be constructed
within any easement granted to the City of Caldwell. Applicant shall
ensure that civil design and easements provided to the City
accommodate cunent and future constuction needs of permanent
sfrucfures such as covered parking structures, future buildings, etc.
3. Appropriate easements for emergency access, transmission lines and/or other utilities shall be
clearly indicated, with recorded instrument numbers provided for said easements, on the
construction drawings.
4. All utilities on and within the boundaries of the subdivision shall be located and/or relocated
underground.
5. All street, sewer, water, fire protection, and street light facilities must be dedicated to the City.
Some conveyance facilities for stormwater drainage may be eligible for dedication to the City.
6. Construction of facilities to be dedicated and/or within public right-of-way shall be performed by
an appropriately licensed public works contractor and shall be inspected by and constructed to
City of Caldwell specifications.
7. Prior to commen@ment of construction in any dedicated rightof-way, or construction of any
improvement intended for dedication to the City or connected to a City facility, the City
Engineering staff is to be notified. This preferably will take place in a pre-construction
conference scheduled by the engineer of record in which all appropriate personnel and utilities
are present. Appropriate City personnel are to be notified in advance of all testing (including
compaction, pressure and coliform, etc.) and given opportunity to be present during conduct of
the testing. The engineer of record or his designated representative is to witness alltests (not
covered by City inspectorc) and a log of inspection visits and testing results is to be kept by the
engineer of record or his representrative.
8. The developer is to employ a responsible design professiona!, preferably the engineer of
record, to oversee and inspect construction, to perform and/or observe all requisite testing of
completed facilities, and to certify that improvements have been constructed according to
approved plans and in compliance with applicable City, State, and Federal standards.
Latitude 96 Apartments
suP21-000013
Page 2 of 6
pft'I
9. The engineer of record shall be held responsible to ensure that subdivision improvements are
in substantial compliance with said engineer's design. Following the construction of the
subdivision improvements, the developers engineer shall provide the City of Caldwell
Engineering Department with electronic (.dwg) format record drawings spatially referenced to
the ldaho State Plane Coordinate System-West Zone, North America Datum (NAD) 83. Vertical
control shall be referenced to the North America Datum (NAVD) 88 for future reference and to
establish that the engineer of record has caused construction to occur in substantial
compliance with the design of said engineer of record.
10. Any note, item or drawing element on the plats, construction drawings, engineering drawings
and/or design drawings related to the property inconsistent with City Codes, Policies and/or
Ordinances shall not be construed as approved unless specifically addressed and granted by
City Council.
Rishts-of-Wav
1. Ustick Road is classified as a PrincipalArterial. The applicant shalldedicate as public rightof-
way a minimum forty (48) foot half width right-of-way (from centerline) along the entire Ustick
Road alignment (per City Standard R-810A).
a. The City of Caldwell currently has construction drawings established and approved for
a Ustick Road Widening project along the subject property frontage. Applicant shall
dedicate to the City any right-of-way & easements necessaryto accommodate the
proposed improvements. Applicant shalldedicate said right-of-way & easements within
30 dap of a written request from the City of Caldwell.
2. All interior private drive isles shall have a minimum width of 26'and meet Caldwell Fire
Department req uirements, whichever is greater.
E@
1. Full frontage half street improvements shall be completed to all classified roads adjacent to the
proposed project (including Ustick Road) in accordance with all City of Caldwell standards and
specifications and the approved set of Ustick Road Widening construction drawings (titled
Ustick Rd and Cleveland Blvd lntersection). Improvements shall include (but are not limited to)
curb, gutter, sidewalk, asphalt, right-hand tum lane on Ustick at the Walmart entran@,
streetlights, joint trench, spare communication conduit along classified roadways, storm
drainage facilities, etc.
2. Access to the proposed project shall fully comply with the Access Management section of the
Middleton Road Conidor Study previously adopted by City Council.
3. Emergency ac@ss shall meet all Caldwell Fire Department requirements.
4. All private driveways/drive isles shall fully comply with City of Caldwell standards and be
approved by the Caldwell Fire Marshall.
5. Not loUbuilding shall have direct access to/from Ustick Road.
Latitude 96 Apartments
suP21-000013
Page 3 of 6
QVJ
6. Applicant shall coordinate with the United States Postal System to determine a cluster mailbox
unit location. Said location shall be interior to the site and shall be located in a manner that will
not impact, or cause queueing onto, Ustick Road. Said location shall be approved by the
Engineering Department during construction drawing plan review and prior to plan approval.
7. Applicants proposed Ustick Road access will initially be granted as a full access. !n the future,
as deemed necessary and appropriate by the City of Caldwell, said access point will be limited
to a right-in/right-out.
Traffic Mitiqation
1. A traffic impact study is not required for this development. However, should the site
generate more than 500 trips per day traffic mitigation requirements shall be applied as
deemed appropriate by the City Engineer. Said traffic mitigation shall be provided priorto
the issuance of any certiflcates of occupancy for this project.
Water
1. All on site water mains will need to be looped into existing mains for fire flow and water quality
purposes. Intemal main sizing and construction plan approval, will be dependent upon the
availability of fire flow.
2. Each buildable lot shall be supplied with potable water. lf buildings are constructed to include
individual units that could feasibly or will be sold separately, each unit shall be serviced
separately
3. The location of water service, including sizing of mains, providing of easements, frontage
construction, and offsite construction are to be decided during review of improvement plans.
This development will be required to comply with the Water Master Study.
Sanitarv Sewer
1. lt shall be the responsibility of the applicant's engineer to verify that connection to existing sewer
mainlines will not exceed the functional capacity of said mainlines. Provision for connectivity by
future developments shall be met in accordance with cunent City standards.
2. The Developer wil! be required (where applicable) to extend all sewer and water mainlines to the
center of adjacent roadways for connectivity by future developments. Locations of said
extensions will be decided during the review of the improvement plans.
3. Each buildable lot shall be provided with individualsewer service. lf buildings are constructed to
include individual units that could feasibty or will be sold separately, each unit shall be serviced
separately.
4. Any easements for sewer lines not in the right-of-way should be at a width sufficient to construct
same and not less than 20 feet in width. Easements for adjacent sewer and water lines not in the
Latitude 96 Apartments
suP21-000013
Page 4 of 6
?K,J
right-of-way shall be at a width sufficient to construct the same and shall be no less than 30 feet
in width.
5. A 20'wide all-weathersurfaces may be required to be constructed over mainlines thatfall outside
the public right-of-way. All weather surfaces shall be constructed sufficiently to support heavy
equipment necessary to construct and maintain sewer under all seasonal weather conditions.
ttr@
1. Existing easements and/or right-of-ways for any irrigation facility shall be determined and
clearly indicated on the construction plans. Construction across or re-routing of these facilities
is subject to approval by the Pioneer lrrigation District and at their discretion or their assigns.
2. The Developer shall maintain any existing upstream drainage rights and downstream inigation
rights across the property. During the design phase of this project, the developer or his
engineer is to contact the appropriate inigation district to help ascertain these rights.
Appropriate facilities shall be provided by the developer to convey irrigation and drainage water
across the property to take care of these offsite needs. There is to be no discharge of
gravity/pressure inigation return water into the projects storm water system.
2. The development is to include a non-potable water pressure irrigation system. The design of
this pressure inigation slatem is to be reviewed and approved by the Caldwell Municipal
lrrigation District prior to construction plan approval. lt shall be required that the system will be
operated and maintained by the Caldwell Municipal lnigation District.
3. Each lot, or building area, shall be provided with a pressure irrigation service in compliance with
Caldwell Municipal I rrigation District standards.
4. All pressure inigation mainlines shall be located in the public right-of-way or within a public
utility easement, with a minimum width of 10 feet, centered over said mainlines as per cunent
City standards.
5. Applicant shall place the pump station in an area that is easily accessible with a recorded
perpetual easement sufficient for convenient access and maintenance of said pump station.
The lot shall be owned and maintained by the home owners association.
6. The applicant shall ensure that an adequate continuous irrigation supply flow is available to
meet the pressure irrigation system requirements of CMID.
7 . The applicant shall transfer a proportionate share of any existing water right(s), except those
held in trust by an inigation district, to the City of Caldwell for both irrigation and domestic water
supply for the subject development. lf this should occur, The City shall assist in registering the
transfer.
8. The proposed development may utilize the existing "Cumberland Subdivision" pressure
irrigation pump station with approvals from Caldwell Municipal Inigation District. Any upgrades
to the pump station necessary to supply the proposed development with pressurized irrigation
water is the responsibility of the Applicant. Should Applicant connect to this pump station they
Latitude 96 Apartments
suP21-000013
Page 5 of 6
?ft,1
shall supply the City of Caldwell with a water model of the whole pressurized inigation syatem
showing that the system design meets all Caldwell Municipal lnigation District standards.
9. All plans and construction drawings submitted to the City of Caldwell for review and approval
for any out-of-season inigation work to be performed within or across facilities located within (or
owned by) irrigation districts other than CMID shall be submitted to the Caldwell Engineering
Department no later than August 15h. Submittal of plans after this date may result in Applicant
not receiving plan approval in time to complete outof-season work.
Storm Drain
1. As noted previously, provision is to be made for the disposal of stormwater drainage in
accordance with the City Stormwater Management Manual and any updates adopted
subsequent to this application. lt is to be noted that retention designs will be denied in most
instances. A copy of this policy is available upon request. The engineer of record is to provide
calculations, which indicate that the assumptions in his stormwater drainage plan comply with
the requirements of the stormwater manual. ln this case, if a storm water system is existing, the
burden of proof is on the developer to verify the capacity is sufficient for the proposed
development.
2. The applicant shall identify and retain all historicaldrainage discharge points from the property
for the purpose of draining on-site storm water detention facilities.
3. Storm water detention basins are required to remain on-site and are to be operated and
maintained by the ApplicanUbusiness owners association/etc.
4. There is to be no discharge of storm water overflow into any inigation water return/discharge
facility/d itch/pipe/etc.
BuildinE Permits
1. Prior to submission of building permits, public utilities and infrastructure must be completed or
an appropriate construction security provided. A 50% temporary restriction in the issuance of
building permits will be enforced until all utility construction has been completed, inspected,
tested, approved by the City and certified by the Applicants engineer; including completion all
punch list items.
2. Applicant shall submit an electronic (dwg.) copy of the project site plan suitable for mapping
and addressing purposes no later than 30 dap prior to submission of the first building permit.
Latitude 96 Apartments
suP21-000013
Page 6 of 6
th-J