Loading...
HomeMy WebLinkAboutPublic Agencyao PUBLIC AGENCY ITEM DATE SUBMITTED BY \N-\ "'Nr-/nA'P l:rb t-1-lb/,/u Nh--S nru/^iqr FEKfi \\- &tesd/ OlJt CT ,o Memorandum To: From: Date: Re Brian Billingsley, Senior Planner Gordon Law, City Engineer Jared Hale, Engineering Tech I SUB-164F(1)-06 Re-plat of Sky Ranch Business Center Phase 2 January 2'1, 2008 The Engineering Department has reviewed the proposed final plat for Sky Ranch Business Center Phase 2 and provides the following comments regarding the project and the submitled final plat: 1. The big four items must be completed before signing of the final plat. These ltems can not be bonded for: a. The water system is operational. b. All weather surfaces are not in place. c, Street signs have not been installed. d. Sewer system is operational. 2. The final plat drawing shall be corrected in accordance with the marked-up copy done January 14,20OB and mailed to W&H Pacilic on January 14,2008. 3. ln an effort to expedite the addressing process of the final plat, the City is asking that an electronic copy on a CD in AutoCAD format be retumed with the revised copy of the linal plat, Page 1 of 1 j(0 O o Memorandum To: From: Brian Billingsley, Senior Planner Gordon Law, City Engineer Jared Hale, Engineering Tech I SUB-164F(1)-06 Re-plat of Sky Ranch Business Center Phase 2 January 21,2008 The Engineering Department has reviewed the proposed final plat for Sky Ranch Business Center Phase 2 and provides the following comments regarding the prolect and the submitted final plat: 1 . The big four items must be completed before signing of the flnal plat. These ltems can not be bonded for: a. The water system is operational. b. All weather surfaces are not in place. c. Street signs have not been installed. d. Sewer system is operational. 2. The final plat drawing shall be conected in accordance with the marked-up copy done January 14, 2008 and mailed to W&H Pacific on January 14, 2008. 3. ln an effort to expedite the addressing process ofthe final plat, the City is asking that an electronic copy on a CD in AutoCAD format be returned with the revised copy of the final plat. Page 1 of 1 Re: Date: N\3 01/00 / 2008 15:12 F.{.I 20E4594191 PIO\'EER IRRIG.{TION . CALDWELL P Z @OOT o o Pioneer Irrigation District JEFF SCOTT S uperinhddsnt P.O. Box426 r CALO /ELL, IOAHo 83606 (208) '15$3517 MARK ZIRSCHfi Asst Su9erintend€nt NAIDA KELLEhER Secrolary-Treasu rBr January 9, 200E City of Caldwell Community De\relopment Deparlrnent Fax: 45$3050 Attn: Anne Marie Skinner Re: Case No. suB-le{F(1){t6 (sky Rench Business Center No' 2l New Final Plat TO WHOM IT MAY CONCERN: Please be advised that the 4OO (Horton) Lateral has a 16 foot from top of bank prescriptive use easement along both sides of the lateral. There are to be no obstructrons, fences, buildings, walk paths. etc. within sakl easement' The above noted easements must be noted on the final plat' lf you have any quesli or comments. please do not hesitate to call Sin Mark F. zirschky Assistant Superintendent \\-s. suB-164(F)-06 o Page I of Io Anne Marie. Skinner From: Larry Strough [Larry.Strough@itd.idaho,govj Sent: Thursday, January 03,2008 2:32 PM To: Anne Marie. Skinner Cc: Phil Choate Subject: SUB-164(F)-06 we have no comment on the enclosed application. Thank You. <<SKMBT_C25008010315260.pdf>> 1/3/2008 \\-\