Loading...
HomeMy WebLinkAboutMap 2L6 11JL V !lam' SC6Z2E NOTES: I. Contractor &hall report to landscape dasinr�lor all conditions which Impair end/or prevent the proper execution of this work prior to begins ng work 2. Coordinate work schedule and observations with landecape architect prior to construction start-up 3. New conifer and deciduous tree planting, sae detail 13 and C/L-1.1. Contractor shall stake all treat deemed necessary, la_ from being blown over, planted with loose root ball, etc - Contractor's option. 4. New shrub planting. See detail A/L-I.I. 5. All plant material &hall conform to the American Nureeryman Standards for type and size shown Plants will be rejected IF not In a sound and healthy condition. 6. All planting beds shall be covered with a minimum of 3' of small M mimes) bark chfpe,Submlt far approval. 1. All plant material shell ba guaranteed For a parlod of one year beginning at the date or acceptance browner. Replace all plant material found dead or not In a healthy condition Immediately with the same size and species at no cost to the Owner. S Finish grades to be smooth and even gradlento with positive drainage in accordance with site grading plan. 9. In all planter bed and lawn areas, the top 6 Inches of topsoil will be amended at a ratio of 3 cubic yardsof organic matter per 1000 square feet. Roto-till organic matter a minimum of 6 Inches Into topsoil. 10. Fertilize all trees and shrubs with 'Agrlfond planting tablets. Quantity per manufacture's recommendations. 11. All planting bade shall have a minimum of IV of topsoil. Lawn areas shall have a minimum of 12' topsoil. Spread, compact and fine grade topeall to a smooth and uniform grade 3' below @trrace or walke and curbs In planting bed areas, 1 1/2' at sod lawn areas, and I' at toad lawn areas. 12. Rouse existing surface topsoil stockpiled an the site. verify suitablllty of surface soil to produce topsoil meeting requirements and amand wheri necessary. Topsoil shall be a loose, Friable, eandy loam, clean and free of toxic materials, noxiow weeds, wead seeds, rocks, grate or other Forelgn material and a ph of 55 to 1.0. IF on-slte tosoil does not meet these minimum standard@, ccnvactore are responsible to either: a) provide approved Imported topsoil, or bJ Improve on-elte topsoil with methods approved by landscape architect. Supplement with Imported topsoil when quantities are Insurriclent. Clean topsoil @f roots, plants, sods, stones,, clay lumps and other. extraneous materials harmful to plant growth If Imported topsoil from off -site sources It required, provide new topsoil that to Fertile, Friable, natural loam, surface soil, reasonably free of subsoil, clay lumps, brush, woods and other litter, and Free of roots, stumps, stones larger than 2 Inches In any dimension, and other extraneous ar toxic matter harmful to plant growth E. Obtain topsoil from local sources or From areas having similar soil characteristic* to that round at project alto. Obtain topsoil only From naturally, well -drained sites where topsoil oeeure In a depth of not last than 4 Inches. b. Repreeentative eamples shall be tested For acidity, Fertility and general texture by a recognized commercial or government agency and copies or the testing agency's Findings and recommendations shall be Furnished to the Architects representative by the contractor. No topsoil &hall be delivered in a Frozen or muddy condltlan. Acidity/alkalinity range - Ph 55 to 16. 13. All landscaped areas shall have an automatic undargrawd sprinkler system which Insures complete coverage and properly zoned Far required water uses. Each hydrozone Is to be Irrigated with separate Individual stations. 14. Planter bads and lawn areas are to have separate hydro -zones. 15. Pop-up sprinkler heads ehall have a minimum Floor height of 4 Inches at lawn areas and IS' at pplanter beds. b. Planter beds are to have drip Irrigation systems as needed, see Irrigation drawings. Aemuals, parennials or ground covers &Frain have a pop-up spray system as needed, see Irragatlon drawings. 11. Electronic water distribution/ timing contrdllars are to be provided. Minimum controller requirements are as follows; -Precise Individual station timing -Run time capabilities for extremes in precipitation rates -At least one program For each hydrozcne -Sufficient multiple cycles to avoid water run-off -Power failure backup for all programed Individual valved watering statlone will be deelenad and metalled to provide water to respective hydro -zones. IS. Immediately clean up any topsoil or other debris on the site created From landscape operations and dispose of properly off alto. la Individual valved watering etstlone will bn designed and Installed to provide water to respective hydro -zones. - - 20. The Irrigation system shall be designed to provide 100% coverage with head to head spacing or triangular spacing as appropriate. 21. SprirkJar heads shall be adjusted to reduce ovarepray onto Impervious surfaces such as eidowlks, driveways, and parking area. 22, Provide minimum (1) quick coupler valve per each (6) automatic valve zones. Approve cxc.v, locations with landscape designer. SHRUB I r DETAIL wuC CONIMMPLANTiNGDETAIL xra war rsrwre•ae mkk�e rerrru r ww«reew •wraiww�wreer'�rwrw�iwws'pi «ewwwrw, E TREE PLANTWO DETAIL Symbol Size Quantity Scientific Name Common Name 2"—Cal 5 Acer platanoides Norway maple 5—Gal 13 Cornus stolonifera Red —twig dogwood 0 5—Gal 61 Juniperus horizontalis Creeping juniper 5 5 Pinus ni,gra Austrian pine 2"—Cal 13 Pyrus calleryana 'Chanticleer' Chanticleer Pear 5-Gal 6 Symphoricarpos albus Common snowberry drimn by C)OO 0 M iNw Mnihor N