MEMORANDUM
To:
From:
Date
Re
Linda James, Community Development Director
Ben Weymouth, Engineering Departrnent
Final Plat, Silverbow Estates Phase 2
4pi120,1999
The Engineering Department has completed a walkthru of Silverbow Estates Phase 2
Subdivision. Earl & Associates has completed a final punch list that is acceptable to the City of
Caldwell.
The final bond amount will be calculated based on the "Engineers Opinion ofCost", which is
attached. The Engineering Department will require a letter of credit equal to the final bond
amount prior to signature of the final plat.
rA- 3
T,nnr, & lssocrerns, tn?o
SURWYORS, ENGINEERS & PL4NNERS
Page 1
ITEM
STREET LIGHTS (2 x $1,500.00)
MANHOLE COLLARS (7 x $175.00)
GATE VALVE COLLARS ( 7 x $105.00)
SCRIBE'S" STAMP IN SIDEWALK (6 x $1s.00)
LOCATE & REPLACE 2" x 4" SEWER SERVICE
MARKER (8 x $25.00)
MAILBOX WAIK-AROIIND (concrete)
(1 x $100.00)
TOTAL:
SIL}'ERBOW ESTATES NO. 2
ENGINEERS OPINION OF COST
FOR THE CONSTRUCTION OF REMAINING ITEMS
APRIL 20,1999
AMOLII\IT
$3,000.00
1,22s.00
90.00
200 00
100 00
$5,3s0.00
73 5.00
U OTE
BouO Annorzgl-
L?MSf k()L'Uou
W
WILL IE )lo7o oF REIAAIMt^/G
t\A5
'l lzoll7
oo
Memorandum
*&/-
t=a
tEl [Vtr
tFR -8 899
To:
From:
Re:
Date
Linda James
Gordon Law, City Engin
The Engineering Department has no objections to proc€eding with final plat approval for
Silverbow Estates phase U. We note, however, that some items on the approved plans and from
the special use permit for this project have not yet been completed. The normal procedure is to
require tlat bonding be provided prior to signing ofthe plat and that all items be complete before
occupancy of any structure within the zuMivision be allowed.
The Engineering Department would require as a matter of course that the responsible engineer's
c€rtification that facilities have been constructed in accordance with approved plans be
forwarded to the Engineering Department and that all supporting documentation be provided for
dedication prior to allowing occupancy in any structure.
Qh',?-
Final Plat approval for Silverbow Estates Phase II
CaseNo. SUB-33F-99
April 8, 1999
o
CALDWELL
o
FIRE DEPARTMENT
The folfowing wil-1
of fire protection
3. Acceptance of
upon acceptance of
for water gual j,ty.
5. A11
outsi-de.
ctTY oF cAtDwEl.L
310 South 7lh Avenue
CALDWELL, IDAHO 83605
(208) 4sS3032
April 5, 1,9 99
Linda James, DirecEor, Developme
,Joseph Si1va, Fire Marshal
Silverbow Phaae 2 Subdivigion
be
for
Ptotelctw Yow PtoWN SaDlIlg Ltxs
SUB.]ECT :
the requirements tso provide minimum 1evels
the proj ect:
1. That a fire-fl-ow of 1,000 gallons per minute be
service the entire projecE. Fire hydrants shalI
average of 500' aparL. 1994 UFC Appendix III-A
avai labI e
be placed
Eo
an
2. Operational fire hydranLs and temporary or permanent street
slgns are required before cornlcustible construcLion begins. UFC
901_ .4 .2 & 901.3
water supply for fire proEect.ion is contingent
the water system by the City Engineer and DEQ
4. Temporary turn-arounds will be requi,red for al-1 phases wiEh
dead-end roadways greater than 150'. The surface shafl consisE of
a minimum of 5" of pit run arrd 2" of %" graveT, Increase the
radius of Eemporary turn-arounds from 45' to 48', Access Std.
turning radii wil-I be required to be 28' inside and 48'
,Ioseph S i lva
APfl - 5 1939
ire Marsha]
r1r\
DATE:
TO:
FROM: