Loading...
HomeMy WebLinkAboutPublic Agencya o PTIBLIC AGENCY SIJBIVtrTTED BYDATEITEM 5. S;\i.ra-4-5-44na , ltaru.D 4torn qr'ry--, 1'4*r5h,a)l Go^dry,* Ln-rn4-x-11+d,nDx'z LNoAT Nlcru,o o B^6D U.1 *"El^> - Zo- 1.3Pn l'vr€ t'lo ?e. o o MEMORANDUM To: From: Date Re Linda James, Community Development Director Ben Weymouth, Engineering Departrnent Final Plat, Silverbow Estates Phase 2 4pi120,1999 The Engineering Department has completed a walkthru of Silverbow Estates Phase 2 Subdivision. Earl & Associates has completed a final punch list that is acceptable to the City of Caldwell. The final bond amount will be calculated based on the "Engineers Opinion ofCost", which is attached. The Engineering Department will require a letter of credit equal to the final bond amount prior to signature of the final plat. rA- 3 T,nnr, & lssocrerns, tn?o SURWYORS, ENGINEERS & PL4NNERS Page 1 ITEM STREET LIGHTS (2 x $1,500.00) MANHOLE COLLARS (7 x $175.00) GATE VALVE COLLARS ( 7 x $105.00) SCRIBE'S" STAMP IN SIDEWALK (6 x $1s.00) LOCATE & REPLACE 2" x 4" SEWER SERVICE MARKER (8 x $25.00) MAILBOX WAIK-AROIIND (concrete) (1 x $100.00) TOTAL: SIL}'ERBOW ESTATES NO. 2 ENGINEERS OPINION OF COST FOR THE CONSTRUCTION OF REMAINING ITEMS APRIL 20,1999 AMOLII\IT $3,000.00 1,22s.00 90.00 200 00 100 00 $5,3s0.00 73 5.00 U OTE BouO Annorzgl- L?MSf k()L'Uou W WILL IE )lo7o oF REIAAIMt^/G t\A5 'l lzoll7 oo Memorandum *&/- t=a tEl [Vtr tFR -8 899 To: From: Re: Date Linda James Gordon Law, City Engin The Engineering Department has no objections to proc€eding with final plat approval for Silverbow Estates phase U. We note, however, that some items on the approved plans and from the special use permit for this project have not yet been completed. The normal procedure is to require tlat bonding be provided prior to signing ofthe plat and that all items be complete before occupancy of any structure within the zuMivision be allowed. The Engineering Department would require as a matter of course that the responsible engineer's c€rtification that facilities have been constructed in accordance with approved plans be forwarded to the Engineering Department and that all supporting documentation be provided for dedication prior to allowing occupancy in any structure. Qh',?- Final Plat approval for Silverbow Estates Phase II CaseNo. SUB-33F-99 April 8, 1999 o CALDWELL o FIRE DEPARTMENT The folfowing wil-1 of fire protection 3. Acceptance of upon acceptance of for water gual j,ty. 5. A11 outsi-de. ctTY oF cAtDwEl.L 310 South 7lh Avenue CALDWELL, IDAHO 83605 (208) 4sS3032 April 5, 1,9 99 Linda James, DirecEor, Developme ,Joseph Si1va, Fire Marshal Silverbow Phaae 2 Subdivigion be for Ptotelctw Yow PtoWN SaDlIlg Ltxs SUB.]ECT : the requirements tso provide minimum 1evels the proj ect: 1. That a fire-fl-ow of 1,000 gallons per minute be service the entire projecE. Fire hydrants shalI average of 500' aparL. 1994 UFC Appendix III-A avai labI e be placed Eo an 2. Operational fire hydranLs and temporary or permanent street slgns are required before cornlcustible construcLion begins. UFC 901_ .4 .2 & 901.3 water supply for fire proEect.ion is contingent the water system by the City Engineer and DEQ 4. Temporary turn-arounds will be requi,red for al-1 phases wiEh dead-end roadways greater than 150'. The surface shafl consisE of a minimum of 5" of pit run arrd 2" of %" graveT, Increase the radius of Eemporary turn-arounds from 45' to 48', Access Std. turning radii wil-I be required to be 28' inside and 48' ,Ioseph S i lva APfl - 5 1939 ire Marsha] r1r\ DATE: TO: FROM: