HomeMy WebLinkAboutPublic Agencyo o
PUBLIC AGENCY
SUBMITTED BYDATEITEM
'tJ(
l1- t,otfi- )-
o
ADDRESSING WORKSHEET
Prepared: February13,2015
Prepared by: Dave Marston, Mappin
FoT: SIENNA HILLS SUB
o
g Superintendent
DIVISION NO.3
BLOCK T7
Lot 13
Lot 14
Lot 16
Lot 17
15372 Moss Creek Wav
15364
15356
15342
15381 Silver Oak Way
15367
15355
15339
13656 Truchard Street
13670
13684
13698
137 t2
t3726
13570 Truchard Stre
13586
13600
13616
BLOCK 22
Lot 3
Lot 4
Lot 5
Lot 6
BLOCK 23
Lot 9
Lot lO
Lot ll
Lot 12
Lot 13
Lot 14
BLOCK 25
Lot 8
Lot 9
Lot l0
Lot ll
BLOCK 26
Lot I
Lot 2 137 19
13697 Truchard Street
(or 15368 Silver Oak Way)
(or 15371 Moss Creek Way)
(or 15347 Cosentino Avenue)
(or 15340 Silver Oak Way)
04
Sienna Hills Subdivision No. 3 Page I of2
BLOCK2T
Lot I
Lot 3
o
13663 Truchard S
13631
NOTE
Lot 15 of Block 17 and [,ot 2 of
o
(or 15346 Cosentino Avenue)
(or 15345 Araujo Avenue)
(or 15343 Moss Creek Way)
(or 15344 Araujo Avenue)
27 are non-residential common lots to be owned
BLOCK 2E
Lot I
Lot 2
13577 Truchard S
13595
and maintained by the Homeowners ation.
Sienna Hills SuMivision No. 3 Page 2 of 2
fl\4
-v
SIENNA HILLS
suBotvtsroN No 3
E
I
V O NITY MAP
(
(
NOTEI
tot 15 or Bloc* 17 ond Lot 2 ol Blo.k
27 o,o lqHerilgdig!
rol3 to be o*fled by the Hom.orno.s
ot4p>)z
E<
Orrlz?-z
Hao(.)
OGI
130r6 tJ6(x)15670 tJ656t3@6lJEA{t37t2 g
o
@
IJ6JI./2/\ B*
1l0e7
*
't!6G:t ll@5 1$n
@,1 fi *
rJ5A6
TRUCHARD STREET
4
YA a1o
@
+'
o,*
PREPARED BY:
D. MARSTON
:I(XIO STREET AODRESS IUI,IBER
20 roT NUXSIR
tl-IECiIEN]D:ADDRESS NUMBERING FOR:
SIENNA HILLS SUBD[V[S[@N NO" 3
A porl ol lhe Sw N ol S*lioa ,a,
To*nship J Narlh, Ronge 3 west.
ol he Aoise I'leridion, Canron County, ldoha
DATE
13 FEB 20',r 5
CITY
OF
CALDWELL
N
E
S
'b
N
I
I
oo
Memorandum
Date
Re
Jarom Wagoner, Senior Planner
Robb MacDonald, City Engineer 'y'+(
Jared Hale, Engineering Tech lll
SUB{2(3)F-14 Sienna Hills Subdivision Phase 3
January 8, 2015
1. The big four items must be completed before signing of the final plat. These ltems can not be
bonded for:
a. The water system is operational. The water system has been constructed, pressure
tests have passed and clean water samples have been received.
b. All weather surfaces are in place. Compaction test results for the roadways have been
submitted to the City for review and approved.
d. Sewer system is operational. The lines have been constructed. The sewer videos and
pressure tests have been submitted and approved. The sewer as-builts have been
submitted and approved.
2. Construction security will have to be provided for those items which are not among the big four
and not yet completed prior to signing of the final plat. The city has not agreed on a bond
amount for those improvements not yet construcled.
3. The final plat drawing will need to be reviewed and approved. The first review has not been
completed.
4. ln an effort to expedite the addressing process of the final plat, the City is asking that 2
electronic copies on 2 separate CD's in AutoCAD format be returned with the revised copy of
the final plat.
Page 1 of 1
To:
From:
The Engineering Department has reviewed the proposed final plat for Sienna Hills Subdivision
Phase 3 and provides the following comments regarding the project and the submifted final plat:
c. Street signs have been installed.