Loading...
HomeMy WebLinkAboutPublic Agencyo o PUBLIC AGENCY SUBMITTED BYDATEITEM 'tJ( l1- t,otfi- )- o ADDRESSING WORKSHEET Prepared: February13,2015 Prepared by: Dave Marston, Mappin FoT: SIENNA HILLS SUB o g Superintendent DIVISION NO.3 BLOCK T7 Lot 13 Lot 14 Lot 16 Lot 17 15372 Moss Creek Wav 15364 15356 15342 15381 Silver Oak Way 15367 15355 15339 13656 Truchard Street 13670 13684 13698 137 t2 t3726 13570 Truchard Stre 13586 13600 13616 BLOCK 22 Lot 3 Lot 4 Lot 5 Lot 6 BLOCK 23 Lot 9 Lot lO Lot ll Lot 12 Lot 13 Lot 14 BLOCK 25 Lot 8 Lot 9 Lot l0 Lot ll BLOCK 26 Lot I Lot 2 137 19 13697 Truchard Street (or 15368 Silver Oak Way) (or 15371 Moss Creek Way) (or 15347 Cosentino Avenue) (or 15340 Silver Oak Way) 04 Sienna Hills Subdivision No. 3 Page I of2 BLOCK2T Lot I Lot 3 o 13663 Truchard S 13631 NOTE Lot 15 of Block 17 and [,ot 2 of o (or 15346 Cosentino Avenue) (or 15345 Araujo Avenue) (or 15343 Moss Creek Way) (or 15344 Araujo Avenue) 27 are non-residential common lots to be owned BLOCK 2E Lot I Lot 2 13577 Truchard S 13595 and maintained by the Homeowners ation. Sienna Hills SuMivision No. 3 Page 2 of 2 fl\4 -v SIENNA HILLS suBotvtsroN No 3 E I V O NITY MAP ( ( NOTEI tot 15 or Bloc* 17 ond Lot 2 ol Blo.k 27 o,o lqHerilgdig! rol3 to be o*fled by the Hom.orno.s ot4p>)z E< Orrlz?-z Hao(.) OGI 130r6 tJ6(x)15670 tJ656t3@6lJEA{t37t2 g o @ IJ6JI./2/\ B* 1l0e7 * 't!6G:t ll@5 1$n @,1 fi * rJ5A6 TRUCHARD STREET 4 YA a1o @ +' o,* PREPARED BY: D. MARSTON :I(XIO STREET AODRESS IUI,IBER 20 roT NUXSIR tl-IECiIEN]D:ADDRESS NUMBERING FOR: SIENNA HILLS SUBD[V[S[@N NO" 3 A porl ol lhe Sw N ol S*lioa ,a, To*nship J Narlh, Ronge 3 west. ol he Aoise I'leridion, Canron County, ldoha DATE 13 FEB 20',r 5 CITY OF CALDWELL N E S 'b N I I oo Memorandum Date Re Jarom Wagoner, Senior Planner Robb MacDonald, City Engineer 'y'+( Jared Hale, Engineering Tech lll SUB{2(3)F-14 Sienna Hills Subdivision Phase 3 January 8, 2015 1. The big four items must be completed before signing of the final plat. These ltems can not be bonded for: a. The water system is operational. The water system has been constructed, pressure tests have passed and clean water samples have been received. b. All weather surfaces are in place. Compaction test results for the roadways have been submitted to the City for review and approved. d. Sewer system is operational. The lines have been constructed. The sewer videos and pressure tests have been submitted and approved. The sewer as-builts have been submitted and approved. 2. Construction security will have to be provided for those items which are not among the big four and not yet completed prior to signing of the final plat. The city has not agreed on a bond amount for those improvements not yet construcled. 3. The final plat drawing will need to be reviewed and approved. The first review has not been completed. 4. ln an effort to expedite the addressing process of the final plat, the City is asking that 2 electronic copies on 2 separate CD's in AutoCAD format be returned with the revised copy of the final plat. Page 1 of 1 To: From: The Engineering Department has reviewed the proposed final plat for Sienna Hills Subdivision Phase 3 and provides the following comments regarding the project and the submifted final plat: c. Street signs have been installed. (frt