The Engineering Department has revierved the proposed final plat for Windsor Creek East Subdivision Phase 6
and provides the follorving comments regarding the project and the subnritted final plat:
L The following items must be completed before signing ofthe final plat. These items cannot be bonded for:
The water system is operational. The water system has been constructed and pressure tested. Clean
rvaler samples have been received.
a
b. All weather surfaces are in place. Compaction test and core sample results have not been submitted,
reviewed or approved for the roadways. The final plat will not be signed, and no certificates of
occupancy rvill be issued until this emergency requirement is complete.
c. Street signs have been installed.
d. The sewer system is operational. The sewer system has been constructed, pressure tested and video
has b€en submitted and approved. Interim as-builts have been approved.
e. The pressure irrigation system within the public roadway is operational. The pressure irrigation
system has been constructed and pressure tested.
f. The storm drain system located within the public roaduay is operational. The storm drain system
has been constructed and passed a visual inspection by the City. Interim as-builts have been
approved.
2. Construction security will have to be provided for those items which are not among the items listed above
and not yet completed prior to signing ofthe final plat. The City has not agreed on a bond amount for those
improvements not yet constnrcted.
3. The final plat drawing has been submitted to the City of Caldwell and has been revie*ed but not yet
approved. The final plat drarving rvill have to be done in accordance with City codes, policies, and
ordinances prior to the Cit_v signing the final plar.
Page 1 of I
[)s-\
Re:
From:
4. In an effort to expedite the addressing process ofthe final plat, the Engineering Dept. requests an electronic
copy in AutoCAD format be returned with a revised full set bound copy ofthe final plat.