Loading...
HomeMy WebLinkAboutPublic Agency Sub21-000046 Sweet Homeoo PUBLIC AGENCY ITEM DATE SUBMITTED BY PA.I rY\}-mto J rrl L7 0r1'*^ tr@ ^Yil&"u.*l,tl PA-2 I PA.3 PA.4 o a l\lemorantlum To: From: Date: Re Debbie Root, Senior Planner T.J. Frans - Project Manager Jake Wells - Engineering Tech I Sweet Home Subdivision (SUB2I -000046) Febnnry 17,2022 The Engrneering Department has reviewed the proposed final plat for Sweet Home Subdivision and prolides the follorving comments regarding the project and the submitted final plat: I . The following ilems must be completed before signing of the final plat. -fhese items cannot be bonded for: The lvater system is operational. The water system has b€en constructed and pressure tested. Clean water samples have been received. b. All weather surfaces are in place. Compaction test and core sample results have not been subm.itted, reviewed or approved for the roadways. The final plat will not be signed, and no certificates of occupancy will be issued until this emergency requirement is complete. c. Street signs have been installed. d. The sewer system is operational. The sewer system has been constructed, pressure tested and video has been submined and approved. Interim as-builts have been approved. e. The pressure irrigation system within the public roadway is operational. The pressure irrigation system has been constructed and pressure tested. f. The storm drain systern located within the public roadway is operational. The storm drain system has been constructed and passed a visual irspection by the City. Interim as-builts have been approved. 2. Construction security will have to be provided for those items which are not among the items listed above and not y€t completed prior to signing ofthe final plat. The City has agreed on a bond amount for those improvements not yet constructed. 3 . The final plat drawing has been submined to the City of Caldwell and has been reviewed but not yet approved. The final plat drawing will have to be done in accordance with City codes, policies, and ordinances prior to the City signing the final plat. 4. In an eftbrt to expedite the addressing process ofthe final plat, the Engineenng Dept. requests an electrodc copy in AutoCAD format be retumed with a revised full set bound copy of the final plat. a Page 1 of I 0 t4- t