The Engineering Department provides the following comments on a request by Timberline Survey
on behalf of TVM lnc. for a preliminary plat for River Bluff Subdivision , a 21 lol single-family low
density development on parcel R34795 (6.14 acres +l). The subject property is located north &
east of Mosaic Charter School which is location at 3121 Lincoln Road, Caldwell, ldaho.
Oevelopment Plans
Development Plans - Prior to commencing construction, plans must be prepared by the
developer's engineer and approved by the City Engineering Department which shall include the
following items:
a. Street section and alignment (including curb and gutter);
b. Sidewalk (sidewalk width based on street classification);
c. Sanitary sewer (per City and DEQ requirements);
d. Potable water (per City and DEQ requirements);
e. Stormwater facilities (per City requirements/storm water manual);
f. Street lighting (per City standards);
g. Street signage (per City and MUTCD requirements);
h. Vertical Datum based on NAVD 88 Datum.
General
Easements for Public Utjlities shalt be '10 feet wide minimum along all front & rear lot lines. A
minimuml0 feet wide easement (or larger if deemed necessary by the City Engineer in order to
facilitate future maintenance operations of utilities) may be required along select interior lot
lines to facilitate pressure inigation or other utilities.
1
River Bluff Subdivision
su821-000028
Page 1 of6 nat
Debbie Root, Senior Planner
TJ Frans, Project Manager ll
SU82 1 -000028, River Bluff Subdivision
December 9, 2021
o t
2. Appropriate easements for emergency access, transmission lines and/or other utilities shall be
clearly indicated, with recorded instrument numbers provided for said easements, on the face
of the flnal plat (visually and in writing). Existrng easements shall be shown on all construction
drawings.
3. All utilities on and within the boundaries of the subdivision shall be located and/or relocated
underground.
4. All street, sewer, water, fire protection, and street light facilities must be dedicated to the City.
Some conveyance facilities for stormwater drainage may be eligible for dedication to the City.
5. Construction of facilities to be dedicated and/or within public right-of-way shall be performed by
an appropriately licensed public works contractor and shall be inspected by and constructed to
City of Caldwell specifications.
6. Prior to commencement of construction in any dedicated right-of-way, or construction of any
improvement intended for dedication to the City or connected to a City facility, the City
Engineering staff is to be notified. This preferably will take place in a pre-construction
conference scheduled by the engineer of record in which all appropriate personnel and utilities
are present. Appropriate City personnel are to be notified in advance of all testing (including
compaction, pressure and coliform, etc.) and given opportunity to be present during conduct of
the testing. The engineer of record or his designated representative is to witness all tests (not
covered by City inspectors) and a log of inspection visits and testing results is to be kept by the
engineer of record or his representative.
7. The developer is to employ a responsible design professional, preferably the engineer of
record, to oversee and inspect construction, to perform and/or observe all requisite testing of
completed facilities, and to certify that improvements have been constructed according to
approved plans and in compliance with applicable City, State, and Federal standards.
8. The engineer of record shall be held responsible to ensure that subdivision improvements are
in substantial compliance with said engineer's design. Following the construction of the
subdivision improvements, the developers engineer shall provide the City of Caldwell
Engineering Department with electronic (.dwg) format record drawings spatially referenced to
the ldaho State Plane Coordinate System-West Zone, North Amerrca Datum (NAD) 83. Vertical
control shall be referenced to the North America Datum (NAVD) 88 for future reference and to
establish that the engineer of record has caused construction to occur in substantial
compliance with the design of said engineer of record.
9. Any note, item or drawing element on the plats, construction drawings, engineering drawings
and/or design drawings related to the property inconsistent with City Codes, Policies and/or
Ordinances shall not be construed as approved unless specifically addressed and granted by
City Council.
River Bluff Subdivision
su821-000028
Page 2 of 6 Q*t
a
Riqhts-of-Wav
1. Lincoln Road is classified as a Minor Arterial. The applicant shall dedicate as public right-of-
way a minimum forty (40) foot half width right-of-way (from centerline) along the entire Lincoln
Road alignment (per City Standard R-810 B).
2. All interior local streets classified as residential shall be dedicated to the City. The applicant
shall dedicate as public right-of-way a minimum fifty-three (53) foot full width right-of-way (per
City Standard R-810 E).
3. Applicant shall dedicate to the City of Caldwell any required right-of-way along Lincoln Road
within 90 days of a written request for right-of-way from the City of Caldwell.
1 . Full frontage half street improvements shall be completed to all classified roads adjacent to the
proposed preliminary plat in accordance with all City of Caldwell standards and specifications.
lmprovements shall include (but are not limited to) curb, gutter, sidewalk, asphalt, streetlights,
.joint trench, spare communication conduit along classified roadways, storm drainage facilities,
etc.
2. All private driveways shall fully comply with City of Caldwell standards and be approved by the
Caldwell Fire Marshall.
Water
1 . All on site water mains will need to be looped into existing mains for fire flow and water quality
purposes. lnternal main sizing and construction plan approval, will be dependent upon the
availability of fire flow.
2. Each phase of development shall have a redundanVsecondary supply of domestic water.
3. Each buildable lot shall be supplied with potable water. lf buildings are constructed to include
individual units that could feasibly or will be sold separately, each unit shall be serviced
separately
4. The location of water service, including sizing of mains, providing of easements, frontage
construction, and offsite construction are to be decided during review of improvement plans.
This development will be required to comply with the Water Master Study.
Sanitary Sewer
'l . lt shall be the responsibility of the applicant's engineer to verify that connection to existing sewer
mainlines will not exceed the functional capacity of said mainlines. Provision for connectivity by
future developments shall be met in accordance with cunent City standards.
2. The location of sewer service, including sizing of mains, providing of easements, frontage
construction, and offsite construction are to be decided during review of improvement plans. This
a
?at
Street
River Bluff Subdivision
su821-000028
Page 3 of 6
o a
development wll be required to installation the trunk lines specifled within the most current
version of the Franklin Sewer Study that reside within the limits of this preliminary plat.
3. The Developer will be required (where applicable) to extend all sewer and water mainlines to the
center of adjacent roadways for connectivity by future developments. Locations of said
extensions will be decided during the review of the improvement plans.
4. Each buildable lot shall be provided with individual sewer service. lf buildings are constructed to
include individual units that could feasibly or will be sold separately, each unit shall be serviced
separately.
5. Any easements for sewer lines not in the right-of-way should be at a width sufficient to construct
same and not less than 20 feet in width. Easements for adjacent sewer and water lines not in the
right-of-way shall be at a width sufficient to construct the same and shall be no less than 30 feet
in width.
6. A 20' wide all-weather surfaces may be required to be constructed over mainlines that fall outside
the public right-of-way. All weather surfaces shall be constructed sufficiently to support heavy
equipment necessary to construct and maintain sewer under all seasonal weather conditions.
lrriqation
Existing easements and/or right-of-ways for any irrigation facility shall be determined and
clearly indicated on the construction plans and on the final plat (excluding prescriptive
easements). Construction across or re-routing of these facilities is subject to approval by the
governing lnigation District and at their discretion, their assigns.
2. The Developer shall maintain any exrsting upstream drainage rights and downstream inigation
rights across the property. During the design phase of this project, the developer or his
engineer is to contact the appropriate inigation district to help ascertain these rights.
Appropriate facilities shall be provided by the developer to convey inigation and drainage water
across the property to take care of these offsite needs.
4. The development is to include a non-potable water pressure irrigation system which is fully
compliant with the Caldwell Municipal lrrigation District (CMID) requirements. The design of
this pressure inigation system is to be reviewed and approved by CMID prior to construction
plan approval. lt shall be required lhat the system will be operated and maintained by CMID
5. Applicant shall place the pump station, and supplemental irrigation well if constructed, within a
platted common lot with a recorded perpetual easement sufficient for convenient access and
maintenance of said pump station. The lot shall be owned and maintained by the home owners
association.
River Bluff Subdivision
su821-000028
Page 4 of 6 ?r
3. There is to be no discharge of gravity/pressure irrigation retum water into the subdivision storm
water system.
6. Each lot shall be provided with a pressure irrigation service.
o o
7. All pressure irrigation mainlines shall be located in the public right of-way, and within a public
utility easement of a minimum of 10 feet in width centered over said mainlines as per current
City standards.
L The applicant shall ensure that an adequate continuous irrigation supply flow is available to
meet the pressure irrigation system requirements of CMID.
9. Applicant shall pipe the pump station delivery ditch from the source point (head gate) to the
pump station. Said delivery ditch shall be shared be with any other users. Pump station
overflow shall be piped from the pump station to the point of discharge into an irrigation
facility/canal/drain/etc and shall not be shared with any other user.
10. The applicant shall transfer a proportionate share of any existing water right(s), except those
held in trust by an irrigation district, to the City of Caldwell for both irrigation and domestic water
supply for the subject development. lf this should occur, The City shall assist in registering the
transfer.
11. All plans and construction drawings submitted to the City of Caldwell for review and approval
for any out-of-season irrigation work to be performed within the governing irrigation districts
facilities shall be submitted to the Caldwell Engineering Department no later than August 15b.
Submittal of plans after this date may result in Applicant not receiving plan approval in time to
complete out-of-season work.
1 . As noted previously, provision is to be made for the disposal of stormwater drainage in
accordance with the City Stormwater Management Manual and any updates adopted
subsequent to this application. lt is to be noted that retention designs will be denied in most
instances. The engineer of record is to provide calculations, which indicate that the
assumptions in his stormwater drainage plan comply with the requirements of the stormwater
manual. ln this case, if a storm water system is existing, the burden of proof is on the developer
to verify the capacity is sufficient for the proposed development.
2. The applicant shall identify and retain all historical drainage discharge points from the property
for the purpose of draining on-site storm water detention facilities.
3. The final plat drawing should indicate that storm water detention basins are to be placed in
common lots in accordance with the referenced Stormwater policy. A note should be placed on
the final plat indicating that all areas designated as common areas are to be operated and
maintained by the home owners association.
4. There is to be no discharge of storm water overflow into any irrigation waler return/discharge
facility/d itch/pi pe/etc.
River Bluff Subdivision
su821-000028
Page 5 of 6 Qat
Storm Drain
a
Plat
1 . Prior to approval of the final plat, subdivision facilities must be completed or an appropriate
construction security provided. There may be temporary restrictions to the obtaining of building
permits, even with acceptable construction security, depending on fire protection, emergency
servrce requirements, and City approval of the sanitary sewer system. A 50% temporary
restriction to obtaining of building permits will be enforced until all facility construction has been
completed, inspected and certified by the Applicants engineer including all punch list items.
2. A note shall be added to the final stating that no lot shall have direct access to/from Lincoln
Road.
3. A note shall be placed on the final plat indicating that all rights-of-way are to be dedicated to the
public.
4. Upon recordation of the plat, the Engineering Department is to be provided with a PDF copy of
the recorded final and 3 full paper set.
5. An electronic (dwg.) copy of the final plat suitable for mapping and addressing purposes will be
required with Final Plat application submittal.
o
River Bluff Subdivision
su821-000028
Page 6 of 6 ?ar
O o
CANYON HIGHWAY DISTRICT NO. 4
15435 HIGHWAY 44
CALDWELL, IDAHO 83607
November I 8, 2021
Citl of Calduell
Hearing Examiner
62 I Cleveland BIvd
Caldrvell. Idaho 83605
Timbcrline Suneying PLLC
847 Parkcentre Wal Ste. 3
Nanrpa, ID 83651
Attention: Tim Spitzke, P.E.
Delivcrctl via li-m:ril
R[: SUB 2l-28 Rivcrtsluff Subdivision - Lincoln Frontage lmprovernenfs Revieu #l
Dear l{earing Exarniner
By agreernent rvith the Ciq'. (Exchange Maintenance Agreement,2020) Canl'on Highrval'
District No.4 (CHD4) ope.rates and maintains Lincoln Road fronting the proposed subdivision.
Under this agreernent, CHD4 is responsible lor access permitting and utilib pennitting along thc'
conidor. and is provided opportunity to reviel, attd comment on developurents as thel ma1'
atl'ect the operation and nraintenance of the roadrval s.
CHD.I has revietred tlre uustarlped. Pretiminary Plat plans for Rivcr Bluff Subdivision, markr-d
as revision I , dated 08- l 9-2021 u,ith rcspect to Lincoln Road. N'{ason Viel Place and River
Bluff Court public roadrval's. Please lind comments on thr' plans as tblloss:
DISTRICT
7z
TELEPHONE 208t 454-A t35
FAX 208/454-2008
Generall. The Lincoln Rd., Mason Vierv Place (fomrerll' Lundergan Avc.) intersection rvas
previousll' built ryith the Mosaic Charter School project and should remain as
constructed.
2. Add a note that a pemrit to use the right-of-uaf (ROW) from CHD4 is rcquircd lor an1'
roadual', utility or access construclion n'ithin the Lincoln Rd. ROW. This must be
accompanied hy a certificate ofliabilitf insurance, riglrlof--nn1 bond, and temporary
traflic control plan.
3. Locate all gravitl'and/or pressure irrigation improvements outsidc ofright-of-say ROW
along Lincoln Road.
4. Locate alldr) utilities outside ofthe ROW along Lincoln Road.
5. Consider adding existing conditions sheet. shorving the Lincoln Rd., \'lason Vierv Place
intemection area.
6. It appears that all storm drainage otrtside ol l.incoln Road ROW rvill florvto the South
and he retained on-site.
7. As the nerv Mason \ries Place (fornrerll' Lundergan Ave.) and River tslufTCourt pLtblic
roadu'ay's are to be maintaincd b1'thc Citl ol'Caldrvcll. CIHD{ has Iro comment olt thenl.
8. All ROW intended lbr use h1 the public antl ntaintained bt CHD'l shall he dedicated to
thepuhlic. t,incoln Rd. ROWisS0'total or40'Noth halfroadrvay. This needs tobe
shosn on the plans.r)aseror'2 frz
Sheet I
l.
Sheel 2
I . Ref'er to General Note 8
Sheet 3
I. No Comments.
Plcasc prolidc onc hard copy and pd I of'all rcvised sheets fbr rer iel .
['lease ttcl flee to contact nre rvitlr an\ questiorls on these conrn]ents.
Thanks.
73*-- ts*?.--
llmce Bal ne- P.E.
Assistant Distlict [ingineer
cc: Iilc: I)elelopnrentr'C:rlclrr ell/[.incoln lld - tliver Ulull'Sub
l
-1
a o
Add Road note, "Contractor shall request a permit to use right-ol--ua1': Utilities and
Others from Canlon Highrvay District No. 4 prior to any u'ork on Lincoln Road lor
u'idening andr'or utility rvork. Request shall be subnritted a rninimum of 7 days prior to
u'ork start date."
Sho* Lincoln Rd. ROW dimensions.
Add a note. "The Southem Boundary ofSection l4 is encumbered by a 70' rvide setback.
No permanent structures may be constructed rvithin the setback.". Show setback on
plans.
llage I ol'2 4