HomeMy WebLinkAboutPublic Agency ANN21-000002oo
PUBLIC AGENCY
SUBMITTED BYDATEITEM
7 zztPA.1
PA-2
PA.3
PA.4
' )J ta^-__.__
o o
Memorandum
The Engineering Department provides the following comments on a request by Tim Mokwa on
behalf of Hayden Homes ldaho, LLC for an annexation of 10.08 acres for the purpose of
developing a Low Density Residential subdivision. Applicant is also requesting approval of a
preliminary plat for Autumn Ridge East Subdivision with 30 residential lots. Subject property
(R35229010) is located approximately 1 800 feet west of N. KCID Road on the north side of Marble
Front Road, Caldwell, ldaho.
Development Plans
1. Development Plans - Prior to commencing mnstruction, plans must be prepared by the
developer's engineer and approved by the City Engineering Department which shall include the
following items:
a. Street section and alignment (including curb and gutter);
b. Sidewalk (sidewalk width based on street classification);
c. Sanitary sewer (per City and DEQ requirements);
d. Potable water (per City and DEQ requirements);
e. Stormwater facilities (per City requirements/storm water manual);
f. Street lighting (per City standards);
g. Street signage (per City and MUTCD requirements);
h. Vertical Datum based on NAVD 88 Datum.
Autumn Ridge East Subdivision
suB-21P-03
Page 1 of 6
To:
From:
Re:
Date:
Debbie Root, Senior Planner
TJ Frans, Project Manager
SUB-21P-02, Autumn Ridge East Subdivision
Aptil7, 2021
o o
General
Easements for Public Utilities shall be 10 feet wide minimum along all front lot lines. A
minimuml0 feet wide easement (or larger if deemed necessary by the City Engineer in order to
facilitate future maintenance operations of utilities) may be required along select interior lot
lines to facilitate pressure inigation or other utilities.
2. Appropriate easements for emergency access, transmissron lines and/or other utilities shall be
clearly indicated, with recorded instrument numbers provided for said easements, on the face
of the final plat (visually and in writing). Existing easements shall be shown on all construction
drawings.
3. All utilities on and within the boundaries of the subdivision shall be located and/or relocated
underground.
4. All street, sewer, water, fire protection, and street light facilities must be dedicated to the City.
Some conveyance facilities for stormwater drainage may be eligible for dedication to the City.
5. Construction of facilities to be dedicated and/or within public right-of-way shall be performed by
an appropriately licensed public works contractor and shall be inspected by and constructed to
City of Caldwell specifications.
6. Prior to commencement of construction in any dedicated right-of-way, or construction of any
improvement intended for dedication to the City or connected to a City facility, the City
Engineering staff is to be notified. This preferably will take place in a pre-construction
conference scheduled by the engineer of record in which all appropriate personnel and utilities
are present. Appropriate City personnel are to be notified in advance of all testing (including
compaction, pressure and coliform, etc.) and given opportunity to be present during conduct of
the testing. The engineer of record or his designated representative is to witness all tests (not
covered by City inspectors) and a log of inspection visits and testing results is to be kept by the
engineer of record or his representative.
7. The developer is to employ a responsible design professional, preferably the engineer of
record, to oversee and inspect construction, to perform and/or observe all requisite testing of
completed facilities, and to certify that improvements have been constructed according to
approved plans and in compliance with applicable City, State, and Federal standards.
8. The engineer of record shall be held responsible to ensure that subdivision improvements are
in substantial compliance with said engineer's design. Following the construction of the
subdivision improvements, the developers engineer shall provide the City of Caldwell
Engineering Department with electronic (.dwg) format record drawings spatially referenced to
the ldaho State Plane Coordinate System-East Zone, North America Datum (NAD) 83. Vertical
control shall be referenced to the North America Datum (NAVD) 88 for future reference and to
establish that the engineer of record has caused construction to occur in substantial
compliance with the design of said engineer of record.
9. Any note, item or drawing element on the plats, construction drawings, engineering drawings
and/or design drawings related to the property inconsistent with City Codes, Policies and/or
Ordinances shall not be construed as approved unless speciflcally addressed and granted by
City Council.
Autumn Ridge East Subdivision
SUB-21P.03
Page 2 of 6
oo
Rights-of-Way
Marble Front Road is classified as a Collector. The applicant shall dedicate as public right-of-
way a minimum thirty-five (35) foot half width right-of-way (from centerline) along the entire
Skyway Drive alignment (per City Standard R-81 0 C).
2. All interior local streets classified as residential shall be dedicated to the City. The applicant
shall dedicate as public right-of-way a minimum fifty{hree (53) foot full width right{f-way (per
City Standard R-810 E).
3. Applicant shall dedicate to the City of Caldwell any required right-of-way along Marble Front
within 90 days of a written request for right-of-way from the City of Caldwell.
Street
1. Full frontage half street improvements shall be completed to all classifled roads adjacent to the
proposed preliminary plat (including Marble Front Road and Smeed Parkway) in accordance
with all City of Caldwell standards and specifications. lmprovements shall include (but are not
limited to) curb, gutter, sidewalk, asphalt, streetlights, joint trench, spare communication conduit
along classified roadways, storm drainage facilities, etc.
2. Applicant shall construct interior roadways per City of Caldwell standard drawing R-810-E.
3. Applicant shall comply with any requirements of the Caldwell Fire Department pertaining to
secondary access requirements.
Outparcels
1. 4511 Marble Front Road (R3523100000)
a. The City of Caldwell Engineering Department will work with the property owner/s of this
parcel to obtain right-of-way across the frontage of Marble Front Road. lf the property
owners dedicate sufficient right-otway applicant shall complete full frontage
improvements across said parcel along Marble Front Road. lmprovements shall include
(but are not limited to) curb, gutter, sidewalk, asphalt, streetlights, joint trench, spare
communication conduit, storm drainage facilities, etc. The proposed Autumn Ridge
East Subdivision shall bare the cost of said frontage improvements.
b. A righthand turn lane for westbound Marble Front Road traffic shall be installed at
Smeed Parkway per City of Caldwell standard drawing R-810H.
c. Should the property owner/s elect to not dedicate sufficient righlof-way for full width
and right hand turn lane improvements applicant shall construct the improvements
possible within the prescriptive righlof-way but will not be required to construct the
remaining improvements outside of the prescriptive right-of-way.
Autumn Ridge East Subdivision
SUB.21P-03
Page 3 of 6
o o
Water
1. All on site water mains will need to be looped into existing mains for fire flow and water quality
purposes. lntemal main sizing and construction plan approval, will be dependent upon the
availability of fire flow.
2. Each phase of development shall have a redundanVsecondary supply of domestic water.
3. Each buildable lot shall be supplied with potable water. lf buildings are constructed to include
individual units that could feasibly or will be sold separately, each unit shall be serviced
separately
4. The location of water service, including sizing of mains, providing of easements, frontage
construction, and offsite construction are to be decided during review of improvement plans.
This development will be required to comply with the Water Master Study.
Sanitary Sewer
'l . lt shall be the responsibility of the applicant's engineer to verify that connection to existing sewer
mainlines will not exceed the functional capacity of said mainlines. Provision for connectivity by
future developments shall be met in accordance with cunent City standards.
2. The location of sewer service, including sizing of mains, providing of easements, frontage
construction, and offsite construction are to be decided during review of improvement plans. This
development will be required to complete the installation of trunk lines specified within the most
current version of the Franklin Sewer Study that reside within the limits of this preliminary plat.
3. The Developer will be required (where applicable) to extend all sewer and water mainlines to the
center of adjacent roadways for connectivity by future developments. Locations of said
extensions will be decided during the review of the improvement plans.
4. Each buildable lot shall be provided with individual sewer service. lf buildings are constructed to
include individual units that could feasibly or will be sold separately, each unit shall be serviced
separately.
5. Any easements for sewer lines not in the righlof-way should be at a width sufficient to construct
same and not less than 20 feet in width. Easements for adjacent sewer and water lines not in the
right-of-way shall be at a width sufflcient to construct the same and shall be no less than 30 feet
in width.
Autumn Ridge East Subdivision
SUB.21P.O3
Page 4 of 6
6. A 20' wide all-weather surfaces may be required to be constructed over mainlines that fall outside
the public right-of-way. All weather surfaces shall be constructed sufficiently to support heavy
equipment necessary to construct and maintain sewer under all seasonal weather conditions.
-Bi
a
lrriqation
1 . Existing easements and/or right-of-ways for any irrigation facility shall be determined and
clearly indicated on the construction plans and on the final plat (excluding prescriptive
easements). Construction across or re-routing of these facilities is subject to approval by the
Pioneer lrrigation District and at their discretion, their assigns.
4. Each lot shall be provided with a pressure irrigation service
5. All pressure inigation mainlines shall be located in the public right-of-way, and within a public
utility easement of a minimum of 10 feet in width centered over said mainlines as per current
City standards.
6. The applicant shall ensure that an adequate continuous irrigation supply flow is available to
meet the pressure irrigation system requirements of CMID.
7. Applicant shall pipe the pump station delivery line from the point of delivery (head gate) to the
pump station and the pump station overflow pipe from the pump station to the point of
discharge.
8. The applicant shall transfer a proportionate share of any existing water right(s), except those
held in trust by an irrigation district, to the City of Caldwell for both irrigation and domestic water
supply for the subject development. lf this should occur, The City shall assist in registering the
transfer.
9. All plans and construction drawings submitted to the City of Caldwell for review and approval
for any out-of-season irrigation work to be performed within Pioneer lrrigation Facilities shall be
submitted to the Caldwell Engineering Department no later than August 1sth. Submittal of plans
after this date may result in Applicant not receiving plan approval in time to complete out-of-
season work.
10. There is to be no discharge of irigation water (pressurized or gravity) into any storm water
overflow/discharges.
o
-Fnt
2. The Developer shall maintain any existing upstream drainage rights and downstream irrigation
rights across the property. During the design phase of this project, the developer or his
engineer is to contact the appropriate irrigation district to help ascertain these rights.
Appropriate facilities shall be provided by the developer to convey irrigation and drainage water
across the property to take care of these offsite needs. There is to be no discharge of
gravity/pressure inigation return water into the subdivision storm water system.
3. The development is to include a non-potable water pressure irrigation system. The design of
this pressure inigation system is to be reviewed and approved by the Caldwell Municipal
lrrigation District prior to construction plan approval. lt shall be required that the system will be
operated and maintained by the Caldwell Municipal lnigation District.
Autumn Ridge East Subdivision
SUB-21P-03
Page 5 of 6
oo
4. There is to be no discharge of storm water overflow into any irrigation water return/discharge
facil ity/d itch/pi pe/etc.
Plat
1. Prior to approval of the linal plat, subdivision facilities must be completed or an appropriate
construction security provided. There may be temporary restrictions to the obtaining of building
permits, even with acceptable construction security, depending on fire protection, emergency
service requirements, and City approval of the sanitary sewer system. A 50% temporary
restriction to obtaining of building permits will be enforced until all facility construction has been
completed, inspected and certifled by the Applicants engineer including all punch list items.
3. A note shall be placed on the Final Plat indicating that all rights-of-way are to be dedicated to
the public.
4. Upon recordation of the plat, the Engineering Department is to be provided with a PDF copy of
the recorded final and 3 full paper set.
5. An electronic (dwg.)copy of the Final Plat suitable for mapping and addressing purposes will
be required with Final PIat application submittal.
Autumn Ridge East Subdivision
SUB-21P-03
Page 6 of 6 ?*t
Storm Drain
1 . As noted previously, provision is to be made for the disposal of stormwater drainage in
accordance with the City Stormwater Management Manual and any updates adopted
subsequent to this application. lt is to be noted that retention designs will be denied in most
instances. A copy of this policy is available upon request. The engineer of record is to provide
calculations, which indicate that the assumptions in his stormwater drainage plan comply with
the requirements of the stormwater manual- ln this case, if a storm water system is existing, the
burden of proof is on the developer to verify the capacity is sufficient for the proposed
development.
2. The applicant shall identify and retain all historical drainage discharge points from the property
for the purpose of draining on-site storm water detention facilities.
3. The final plat drawing should indicate that storm water detention basins are to be placed in
common lots in accordance with the referenced Stormwater policy. A note should be placed on
the final plat indicating that all areas designated as common areas are to be operated and
maintained by the home owners association.
2. A note shall be added to the final plat stating that no lot shall have direct access to/from Marble
Front Road.