DATE:4pn122,2002
Steve Hasson, Community Development Director
FROM:Douglas Brown, Assistant Chief / Fire Marshal
SUBJECT:Comments for Caldwell City Council
May 6,2002 Meeting
The Caldwell Fire Department (CFD) offers the following comments regarding the following cases
to come before the Caldwell City Council on May 6,2002:
Case No:
Applicant:
Project:
Location:
,/ Case No:
Applicant:
Project:
Location:
The CFD has commented and worked with the principles for this project and has approved all
fire department criteria including street configuration, street name, turnaround, fire flow and fire
hydrant locations.
suB-31(2)F-99
Powell Estates Development, LLC
Powell Estates:. PUD
NE of Florida and Ustick
suB-s7(1)F-00
Dyver Development, LLC
Virginia Park Subdivision, Unit 1
NE of Hwy.20-26 and KCID Road
The CFD has commented and worked with the principles for this project and has conditioned all
fire department criteria for this subdivision unit. This includes street configurations (secondary
access plan), street names, turnarounds, fire flows and fire hydrant locations. One correction is
noted from the plan submitted - Virginia Park Way was approved as: Virsinia Parkwav. The
final plat map street name and the street name signs should be changed to reflect this
modification.
1
qhe
,a
Memorandum
To:Steve Hasson
From: Gordon Law, City Engineer &4 D
trGtr[Vtr
Ben L. Weymouth, Assistant City Engineer APR 29 n02
SUB-31(2)F-99 (Powell Estates Subdivision No. 2)
Date Aprrl28,2002
The Engineering Department has reviewed the proposed final plat for Powell Estates Subdivision,
No. 2. The department provides the following comments on the submitted final plat:
l. The City has not received approval letters from Pioneer Irrigation District for the pressurized
irrigation system or concurrence with the design and facilities that preserve existing irrigation
rights.
2. The sewer system is not operational. The sewer lines have been constructed but have not
been tested. The plat will not be signed and building permits will not be issued until the
sewer system is operational.
3. The water system is not operational. The plat will not be signed and building permits will not
be issued until this emergency service requirement has been completed. The water system
has been constructed but has not been tested.
4. The roadways do not meet City requirements for an all-weather surface. The subgrade has
been excavated, but the base material has not yet been installed in the roadways. The plat
will not be signed and building permits will not be issued until this emergency service
requirement has been completed.
5. Street signs have not yet been installed. Building permits will not be issued until this
emergency service requirement has been completed.
6. Construction security will have to be provided for those items not yet completed prior to
approval of the Final Plat. The developer has submitted a bond estimate that is currently
being reviewed by the Engineering Department.
7. The following revisions should be made to the proposed Final Plat drawing:
a) Include "Public Utilities" in Note # 2.b) Place restrictions upon the use of Lot # 32 to protect it as a secondary access. Coordinate
with the Fire Marshall.
M,/
Qh
Re:
04/22/2002 L4:29 FAX 4!94401 PIONEER TRRIG Ex 01/01e
Pioneer Irrigation District
I.oNTlE J FNEETA]{
Sr{perrrtidErrl
ilAIOA E. XELLEI*F
Scrrtfrry li*aw*
P- O. lOX.2i r CALDtfll:LL, IOAHO ti600(zot) .5$3iiu
Apdl 22, 2002
IUr. Stevc Hasson
Caldwcll Com:nunity Dcveloprncnt
trGtE[Vtr
APR 22 2002 D
Fax: 455-3050
RE: POWELL ESTATES
Dear Mr, Hassou:
P1caa€ bc adviscd it ie thc iotent of Pioneerlnigation DisEict to takc over the operilion
and maintcnancc of thc abovc namcd subfivision once the following conditioru arE rnet:
l. Thc prcssurizcd irrigation system ia installed per all the ilaudsrd
specificafions of tlre Disrict,
2. Any concems outlined by the Distict's engineeriag firm ara addreosed; arrd
3, The Opcralion and Maintenance Agreernent has been dravm up and signcri
by all parties, including the Ctrairman of thc Boarrl of Directors of Pionctrr
Inigation District.
Ifyou havc eny qucsbious, pleasc fecl free to call-
Sincerely,
Lonnie J,